background image

 

PCB Load & Torque, Inc.   

 Toll-Free in USA 866-684-7107   

 716-684-0001   

 www.pcbloadtorque.com

 

 

 

DUAL BRIDGE LOAD CELL OPERATION MANUAL 

 

9

 

Certificate  information  includes  tabulated  measurement 
variable  data  zero  balance,  bridge  input/output  resistance, 
computer  nonlinearity  and  hysteresis,  static  error  band  (SEB) 
calculations and entries abilities and traceability statements. 

If an initial evaluation shows that a transducer requires repair, 
PCB will provide the customer with an estimate prior to taking 
any corrective action. 
 

12.1 RMA / Purchase Order 

Please  request  a  return  material  authorization  (RMA)  before 
sending  a  load  cell  back  to  the  factory  for  any  reason.  For 
calibration  services,  if  possible,  a  copy  of  the  purchase  order 
covering  the  requested  services  should  be  included  with  the 
returned load cell. 

 

13.0 WARRANTY 

 
Standard  warranty  on  dual  bridge  load  cells  covers  parts  and 
workmanship.    For  full  details,  refer  to  the  Warranty 
Statement supplied with each load cell. 
  
If  the  load  cell  is  defective  for  reasons  other  than  overloads, 
return  it  to  the  factory  for  detailed  evaluation.  Factory 
evaluation  may  show  that  the  load  cell  is  repairable  or  non-
repairable and if repair or replacement will be under warranty. 
If not under warranty, the customer will be contacted with the 
cost  of  repairs  and  recalibration.  Once  authorization  to 
proceed is received, a delivery date will be provided. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Manual Number: 54811 

Manual Revision: A 

Revision Date: 6/6/13 

ECO Number:  41606 

Содержание 1408-02ADB

Страница 1: ...DUAL BRIDGE Installation and Operating Manual For assistance with the operation of this product contact PCB Load Torque Inc Toll free 866 684 7107 24 hour SensorLine 716 684 0001 Fax 248 888 8266 E ma...

Страница 2: ...repair User servicing or repair is not recommended and if attempted may void the factory warranty Calibration Routine calibration of sensors and associated instrumentation is recommended as this helps...

Страница 3: ...ry customer service representative Warranty All equipment and repair services provided by PCB Piezotronics Inc are covered by a limited warranty against defective material and workmanship for a period...

Страница 4: ...isclosure Table Pb Hg Cd Cr VI PBB PBDE O O O O O O PCB X O O O O O O O O O O O X O O O O O O O O O O O O O O O O O O O O O O O O O X O O O O O O O O O X O O O O O O O O O O O X O O O O O X O O O O O...

Страница 5: ...e O O X O O O Wires O O O O O O Cables X O O O O O Plastic O O O O O O Solder X O O O O O Copper Alloy Brass X O O O O O This table is prepared in accordance with the provisions of SJ T 11364 O Indica...

Страница 6: ...in x 4 50 in 203 20 mm x 114 30 mm 8 Weight 54 lb 25 5 kg Mounting Thread 1 3 4 12 UNF 3B No Metric Equivalent Sensing Element Strain Gage Strain Gage Mounting Torque 2600 in lb 294 Nm Deflection at F...

Страница 7: ...1 41 35 8 CONNECTOR SHROUD CONNECTOR B DUAL BRIDGE ONLY PT02E 10 6P CONNECTOR WIRING CODE TYPICAL PIN A EXC PIN B SIG PIN C SIG PIN D EXC PIN E N C PIN F N C THREAD x2 12 53 8 STANDARD LOAD CELL 1 3 4...

Страница 8: ...LECTRICAL INSTALLATION 5 5 1 Electrical Drawing Western Regional Std 5 5 2 Cable Grounding Considerations 5 6 0 CALIBRATION 5 6 1 Calibration Certificate Description 5 6 1 1 Measured Output 6 6 1 2 Hy...

Страница 9: ...the parts under test have completed the planned fatigue test cycles 3 0 OVERVIEW Dual bridge fatigue rated load cells are specifically designed for repetitive testing Applications include material te...

Страница 10: ...ote that the performance of the load cell may be affected if the factory installed mounting base is removed or modified 4 2 Mounting Load Cell to a Standard Base or Custom Fixture If the load cell is...

Страница 11: ...ctor Protector 1 Remove the 4 40 x 1 4 button head cap screws from the connector using a 1 16 hex wrench as shown in Figure 7 2 Carefully pull the connector from the load cell Take care to not break o...

Страница 12: ...wiring may result in unstable or noisy signals A simple test with a voltmeter connected between the power cord ground and the structure on which the load cell is mounted can confirm that the structur...

Страница 13: ...s are adjusted such that the error due to eccentric loading is less than 0 1 per inch of offset Side loads moments and torque must be limited to avoid electrical or mechanical damage to the load cell...

Страница 14: ...tion certificate and adjust the span or gain until the display reads the force value stated on the certificate 4 Repeat steps 1 3 to verify that a valid calibration setting has been obtained 5 If poss...

Страница 15: ...ridge resistances A D excitation and B C the signal leads 9 Check bridge balance 10 Keep a record of your observations correct problems or contact PCB factory for assistance 11 2 1 Estimating Bridge B...

Страница 16: ...factory for any reason For calibration services if possible a copy of the purchase order covering the requested services should be included with the returned load cell 13 0 WARRANTY Standard warranty...

Отзывы: