PCB Piezotronics M1204-13A Скачать руководство пользователя страница 9

 

PCB Load & Torque, Inc.   

 Toll-Free in USA 866-684-7107   

 716-684-0001   

 www.pcbloadtorque.com

 

 

 

GENERAL PURPOSE LOW PROFILE LOAD CELL OPERATION MANUAL 

 

3

 

3.2 Standard Components 

The following figure describes the standard components of the 
general purpose low profile load cells. 
 
 
 
 
 
 
 
 
 
 
 

3.3 Optional Components 

The following figure describes the optional components of the 
general purpose low profile load cells. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTE:  Connector  protectors  are  standard  on  8”  and  11” 

models. 

 
Table 3 describes the available optional components 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTE:  Pre-tension  studs  include  the  threaded  stud  and  the 

jam nut. 

NOTE:  The  use  of  the  tension  base  greatly  increases  the 

performance of the low profile load cell. 

 
 

4.0 MECHANICAL INSTALLATION 

 
The  following  mechanical  installation  instructions  should  be 
observed if optional components are to be used. 
 

4.1 Mounting Bases 

All  low-profile  load  cells  are  calibrated  with  a  factory 
installed  standard  mounting  base.  An  optional  custom 
(customer  supplied)  mounting  base  can,  with  special 
arrangements,  be  installed  and  used  for  calibration. 
However, there will be an extra charge for the installation of 
the load cell on the customer’s base / fixture.  
 

NOTE:  To insure catalog performance specifications are met 

the customer’s supplied fixture or base must be flat to 
within  0.0002  inch  and  provide  similar  stiffness  and 
hardness to a factory base. 

 
Unless  otherwise  specified/requested,  the  load  cell  is 
calibrated  with  a  factory  installed  mounting  base.  It  is 
important to  note that the performance of  the load cell  may 
be affected if the mounting base is not used or modified. 

 

4.2 Mounting Load Cell to a Standard Base or 
Custom Fixture 

If the load cell is to be mounted to a custom base or fixture, it 
is necessary to consider the following: 
 

1.

 

The thickness of the new base or fixture must not be 
any  thinner  than  the  original  base  supplied  with  the 
load  cell.  Materials  used  must  have  the  same 
temperature  coefficient  of  expansion  (for  example, 
4140 Steel). 

 
2.

 

The  mounting  surface  must  be  flat  (within  0.0002 
inches),  and  steel  fixtures  must  have  a  hardness  of 
Rockwell C 38 to 42.  

 
3.

 

The  threaded  holes  and  under-head  of  the  fasteners 
must  be  lightly  lubricated  with  30  weight  oil  or 
equivalent prior to tightening the mounting bolts. 

 

4.

 

Refer  to  Table  4  for  the  final  tightening  torque 
required for each bolt size. 

 

5.

 

Tighten the bolts in an incremental cross pattern with 
the  following  sequence:  start  with  all  bolts  finger 
tight followed by 25%, 50% and finally 100% of the 
required torque being applied. 

 
 
 

 

Tension 

Base 

Connector 

Protector 

Pre-Tension 

Stud 

Pre-Tension 

Stud 

Jam Nut 

Jam Nut 

 

Load Cell 

Connector 

Figure 2

 

– Standard Components 

Figure 3

 

– Optional Components 

Item Number 

Item Description 

084A40 

Lifting Rings (side), 1211/1411 Series 

084A41 

Lifting Plug (top), 1211/1411 Series 

084A55 

Pre-Tension Stud (5/8”-18 Thread), 1203/1403 Series 

084A56 

Pre-Tension Stud (1 ¼”-12 Thread), 1204/1404 Series 

084A57 

Pre-Tension Stud (1 ¾”-12 Thread), 1208/1408 Series 

084A58 

Pre-Tension Stud (2 ¾”-8 Thread), 1211/1411 Series  

084A59 

Pre-Tension Stud (2 ¾”-8 to 1 ¾”-12 Thread) 1211/1411 Series 

084A90 

Connector Protector, 1403 and 1404 Series 

084A100 

Tension Base (5/8”-18 Thread) 1203/1403 Series 

084A101 

Tension Base (1 ¼”-12 Thread) 1204/1404 Series 

084A103 

Tension Base (1 ¾” -12 Thread) 1208/1408 Series 

084A104 

Tension Base (2 ¾” -8 Thread) 1211/1411 Series 

Table 3

 

– Optional Components 

Содержание M1204-13A

Страница 1: ...oad cell Installation and Operating Manual For assistance with the operation of this product contact PCB Piezotronics Inc Toll free 800 828 8840 24 hour SensorLine 716 684 0001 Fax 716 684 0987 E mail...

Страница 2: ...repair User servicing or repair is not recommended and if attempted may void the factory warranty Calibration Routine calibration of sensors and associated instrumentation is recommended as this helps...

Страница 3: ...ry customer service representative Warranty All equipment and repair services provided by PCB Piezotronics Inc are covered by a limited warranty against defective material and workmanship for a period...

Страница 4: ...isclosure Table Pb Hg Cd Cr VI PBB PBDE O O O O O O PCB X O O O O O O O O O O O X O O O O O O O O O O O O O O O O O O O O O O O O O X O O O O O O O O O X O O O O O O O O O O O X O O O O O X O O O O O...

Страница 5: ...e O O X O O O Wires O O O O O O Cables X O O O O O Plastic O O O O O O Solder X O O O O O Copper Alloy Brass X O O O O O This table is prepared in accordance with the provisions of SJ T 11364 O Indica...

Страница 6: ...nted Steel Sensing Element Strain Gage Strain Gage Mounting Torque 1400 lbf in 158 Nm Deflection at Full Scale Capacity 0 002 in 0 05 mm Electrical Connector PT02E 10 6P PT02E 10 6P All specifications...

Страница 7: ...4 5 0 ELECTRICAL INSTALLATION 5 5 1 Electrical Drawing Western Regional Std 5 5 2 Cable Grounding Considerations 5 6 0 CALIBRATION 5 6 1 Calibration Certificate Description 5 6 1 1 Measured Output 6...

Страница 8: ...evaluated for potential failure modes of the fixtures It is important to use threaded fasteners properly when assembling test fixtures used with the load cells Fixtures with inadequately designed bol...

Страница 9: ...modified 4 2 Mounting Load Cell to a Standard Base or Custom Fixture If the load cell is to be mounted to a custom base or fixture it is necessary to consider the following 1 The thickness of the new...

Страница 10: ...f Connector Protector 1 Remove the 4 40 x 1 4 button head cap screws from the connector using a 1 16 hex wrench as shown in Figure 7 2 Carefully pull the connector from the load cell Take care to not...

Страница 11: ...A simple test with a voltmeter connected between the power cord ground and the structure on which the load cell is mounted can confirm that the structure has been properly grounded If the power cord g...

Страница 12: ...into the load cell structure The strain gage bridges on general purpose low profile load cells are adjusted such that the error due to eccentric loading is less than 0 25 per inch of offset for 1200 s...

Страница 13: ...s on the load cell If possible remove all loads 2 Power up the host signal conditioner and connect it to the load cell via appropriate cable and allow for a 30 minute warm up 3 Set the load indicator...

Страница 14: ...e load cell is mounted on 5 Check the signal conditioning electronics for proper setup 6 Check the insulation resistance of shielded conductors for short circuits 7 Check isolation resistance load cel...

Страница 15: ...der Please request a return material authorization RMA before sending a load cell back to the factory for any reason For calibration services if possible a copy of the purchase order covering the requ...

Отзывы: