background image

MOUNTNG THREAD SEE DRAWING

5-40

A

M3 X 0.50

B

10-32

C

M5 X 0.80

D

1/4-28

E

M6 X 1.00

F

BOLT THREAD SEE DRAWING

10-32

C

M5 X 0.80

D

1/4-28

E

M6 X 1.00

F

M8 X 1.25

F

1

1

2

2

3

3

4

4

A

A

B

B

CODE

IDENT. NO.

52681

DWG. NO.

SCALE:

SHEET

DRAWN

CHECKED

ENGINEER

TITLE

UNLESS OTHERWISE SPECIFIED TOLERANCES ARE:

DIMENSIONS IN MILLIMETERS

[ IN BRACKETS ]

XX

    

±

 

0.13

ANGLES

  

 

2 DEGREES

3425 WALDEN AVE. DEPEW, NY 14043

(716)  684-0001 E-MAIL:  [email protected]

DIMENSIONS  IN INCHES

DECIMALS     XX

  

 

±.01

ANGLES

  

 

2 DEGREES

FILLETS AND RADII 

 .003 - .005 

DECIMALS     X

   

 ±

 

0.3

FILLETS AND RADII 

0.07 - 0.13 

INSTALLATION DRAWING

081-XXXX-90

1 OF 1

N.T.S.

FOR STANDARD

081 SERIES MOUNTING

XXX   ±.005

JDM

3/9/07

ECB

3/9/07

JJD

3/9/07

   

   

"A"

5-40

MOUNTING INSTRUCTIONS

(METRIC DIMENSIONS IN BRACKETS)

MOUNTING HOLE PREPARATION:

.101[

2.57] 

X .20[5.1]

 MIN.

5-40 UNC-2B
X .15[3.8]

 MIN.

4.) RECOMMENDED MOUNTING TORQUE,
     4-5 INCH POUNDS 
     [45-55 NEWTON CENTIMETERS].

"B"

M3 X 0.50

MOUNTING INSTRUCTIONS

(ENGLISH DIMENSIONS IN BRACKETS)

MOUNTING HOLE PREPARATION:

2.5[

.099] 

X 4.6 [1.8]

 MIN.

M3 X 0.50-6H
X 3.3[.13]

 MIN.

4.) RECOMMENDED MOUNTING TORQUE,
     45-55 NEWTON CENTIMETERS 
     [4-5 INCH POUNDS].

"C"

10-32

MOUNTING INSTRUCTIONS

(METRIC DIMENSIONS IN BRACKETS)

4.) RECOMMENDED MOUNTING TORQUE,
     10-20 INCH POUNDS 
     [113-225 NEWTON CENTIMETERS].

MOUNTING HOLE PREPARATION:

.159[

4.04] 

X .23[5.8]

 MIN.

10-32 UNF-2B
X .15[3.8]

 MIN.

"D"

M5 X 0.80

MOUNTING INSTRUCTIONS

(ENGLISH DIMENSIONS IN BRACKETS)

4.) RECOMMENDED MOUNTING TORQUE,
     113-225 NEWTON CENTIMETERS
     [10-20 INCH POUNDS].

MOUNTING HOLE PREPARATION:

4.22[

.166] 

X 7.62 [.300]

 MIN.

M5 X 0.8-6H
X 5.08[.200]

 MIN.

"E"

1/4-28

MOUNTING INSTRUCTIONS

(METRIC DIMENSIONS IN BRACKETS)

4.) RECOMMENDED MOUNTING TORQUE,
     2-5 FOOT POUNDS 
    [3-7 NEWTON METERS].

MOUNTING HOLE PREPARATION:

.218[

5.54] 

X .300[7.62]

 MIN.

1/4-28 UNF-2B
X .200[5.08]

 MIN.

"F"

M6 X 0.75, M6 X 1.00, M8 X 1.25

MOUNTING INSTRUCTIONS

(ENGLISH DIMENSIONS IN BRACKETS)

4.) RECOMMENDED MOUNTING TORQUE,
     3-7 NEWTON METERS [2-5 FT POUNDS].

M8 X 1.25

MOUNTING HOLE PREPARATION:

6.75[

.266] 

X 8.64 [.340]

 MIN.

M8 X 1.25-6H
X 5.00[.197]

 MIN.

M6 X 0.75

MOUNTING HOLE PREPARATION:

5.31[

.209] 

X 7.62 [.300]

 MIN.

M6 X 0.75-6H
X 5.08[.200]

 MIN.

M6 X 1.0

MOUNTING HOLE PREPARATION:

5.05[

.199] 

X 8.10 [.320]

 MIN.

M6X 1.0-6H
X 6.35[.250]

 MIN.

"B"

"C"

"G"

MOUNTING INSTRUCTIONS

FOR SPECIAL THREAD LENGTHS

(METRIC DIMENSIONS IN BRACKETS)

THREAD DEPTH : B= X + 1 THREAD PITCH
DRILL DEPTH : C= B + 3 THREAD PITCH
SEE A-F FOR APPROPRIATE DRILL AND TAP
THREAD PITCH= 1/TPI [P]

3.)    FOR BEST RESULTS, PLACE A THIN LAYER OF SILICONE GREASE (OR EQUIVALENT) ON INTERFACE PRIOR 
        TO MOUNTING.

MOUNTING SURFACE SHOULD BE FLAT TO WITHIN .001(0.03) TIR OVER DIM 'A' WITH A               OR BETTER FINISH FOR BEST RESULTS.

DRILL PERPENDICULAR TO MOUNTING SURFACE TO WITHIN 

1

.

SENSOR 

SENSOR 

"THRU-BOLT" 

"THRU-BOLT" STUD MOUNT

INTEGRAL STUD MOUNT

 SENSOR 
 THREAD

 MOUNTING
 THREAD

 SENSOR 
 THREAD

 MOUNTING
 THREAD

STANDARD STUD MOUNT

"X"

"X"

 SENSOR THREAD

"X"

1

1

1

1

1

1

1

1

2

2

2

2

2

2

2

MOUNTING HOLE PREPARATION:

 DRILL DIA.

X "C"

 MIN.

TAP
X "B"

 MIN.

1

"A"

"A"

"A"

"P"

1 THREAD PITCH 

SHOWN

"X"

SENSOR 

 INTEGRAL
 MOUNTING
 STUD

63[1.61]

REVISIONS

REV

DESCRIPTION

DIN

P

UPDATE DRAWING

25686

2

1

MOUNTING THREAD

SEE DRAWING

5-40

A

M3 X 0.50

B

10-32

C

M5 X 0.80

D

1/4-28

E

M6 X 1.00

F

08

1-

X

XX

X

-9

0

PCB Piezotronics Inc. claims proprietary rights in

the information disclosed hereon.  Neither it nor any

reproduction thereof will be disclosed to others
without the written consent of PCB Piezotronics Inc.

Содержание ICP 356A26

Страница 1: ... ICP accel 50 mV g 1 to 5k Hz 4 Installation and Operating Manual For assistance with the operation of this product contact PCB Piezotronics Inc Toll free 800 828 8840 24 hour SensorLine 716 684 0001 Fax 716 684 0987 E mail info pcb com Web www pcb com ...

Страница 2: ...ialized tests including sensitivity at elevated or cryogenic temperatures phase response extended high or low frequency response extended range leak testing hydrostatic pressure testing and others For more information contact your local PCB Piezotronics distributor sales representative or factory customer service representative Returning Equipment If factory repair is required our representatives ...

Страница 3: ...ation on particular operating steps The following symbols may be found on the equipment described in this manual This symbol on the unit indicates that high voltage may be present Use standard safety precautions to avoid personal contact with this voltage This symbol on the unit indicates that the user should refer to the operating instructions located in the manual This symbol indicates safety ea...

Страница 4: ...E 住房 O O O O O O PCB板 X O O O O O 电气连接器 O O O O O O 压电晶体 X O O O O O 环氧 O O O O O O 铁氟龙 O O O O O O 电子 O O O O O O 厚膜基板 O O X O O O 电线 O O O O O O 电缆 X O O O O O 塑料 O O O O O O 焊接 X O O O O O 铜合金 黄铜 X O O O O O 本表格依据 SJ T 11364 的规定编制 O 表示该有害物质在该部件所有均质材料中的含量均在 GB T 26572 规定的限量要求以下 X 表示该有害物质至少在该部件的某一均质材料中的含量超出 GB T 26572 规定的限量要求 铅是欧洲RoHS指令2011 65 EU附件三和附件四目前由于允许的豁免 CHINA RoHS COMPLIANCE ...

Страница 5: ... O Wires O O O O O O Cables X O O O O O Plastic O O O O O O Solder X O O O O O Copper Alloy Brass X O O O O O This table is prepared in accordance with the provisions of SJ T 11364 O Indicates that said hazardous substance contained in all of the homogeneous materials for this part is below the limit requirement of GB T 26572 X Indicates that said hazardous substance contained in at least one of t...

Страница 6: ......

Страница 7: ......

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ...IONS METRIC DIMENSIONS IN BRACKETS 4 RECOMMENDED MOUNTING TORQUE 2 5 FOOT POUNDS 3 7 NEWTON METERS MOUNTING HOLE PREPARATION 218 5 54 X 300 7 62 MIN 1 4 28 UNF 2B X 200 5 08 MIN F M6 X 0 75 M6 X 1 00 M8 X 1 25 MOUNTING INSTRUCTIONS ENGLISH DIMENSIONS IN BRACKETS 4 RECOMMENDED MOUNTING TORQUE 3 7 NEWTON METERS 2 5 FT POUNDS M8 X 1 25 MOUNTING HOLE PREPARATION 6 75 266 X 8 64 340 MIN M8 X 1 25 6H X ...

Страница 17: ......

Отзывы: