background image

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

A

A

B

B

C

C

D

D

A

B

DWG. NO.

SCALE:

SHEET

DRAWN

CHECKED

ENGINEER

TITLE

UNLESS OTHERWISE SPECIFIED TOLERANCES ARE:

DIMENSIONS IN MILLIMETERS

[ IN BRACKETS ]

ANGLES

  

`

 .5 DEGREES

24350 Indoplex Circle, Farmington Hills,MI 48335
(716)  684-0001 E-MAIL:  [email protected]

DIMENSIONS  IN INCHES

ANGLES

  

`

 

.5 DEGREES

FILLETS AND RADII 

.015 MAX 

FILLETS AND RADII 

0.38 MAX

OUTLINE DRAWING

60059

1 OF 1

3/4

1202/1402 SERIES, PT CONNECTOR

LOW PROFILE LOAD CELL

PTE

09.22.14

DECIMALS     XX   ±.01

XXX   ±.005

DECIMALS    X   ± 0.3

XX   ± 0.13

A

B

6

0

0

5

9

PCB Load & Torque Inc. claims proprietary rights  in 
the  information disclosed hereon.  Neither it nor any 
reproduction thereof will be disclosed to others without
the written consent of PCB Load and Torque Inc.

3.53 [89.5]

n

.406 [10.3]

12X 

 THRU

n

5.125 [130.2] B.C.

1"-14UNS-3B 

x

1.37 [34.8]

 

45°

90°

n

2.59 [65.8]

1.75 [44.5]

n

6.06 [153.9]

.81 [20.6]

1.63 [41.4]

CONNECTOR "A"
PTO2A-10-6P CONNECTOR
WIRING CODE: TYPICAL
PIN A +EXC.
PIN B +SIG.
PIN C -SIG.
PIN D -EXC.
PIN E N/C
PIN F N/C

CONNECTOR "B"
DUAL BRIDGE ONLY

1202, 1402 SERIES LOAD CELLS

1

SUPPLIED WITH MATING FASTENERS

1202, 1402 SERIES BASES

n

2.59 [65.8]

n

5.125 [130.2] B.C.

3/8-24 UNF - 2B 

x

 .88

12X 

1

45°

n

6.06 [153.9]

1.75 [44.5]

.81 [20.6]

.37 [9.4]

n

2.25 [57.2]

.030 [0.8]

1"-14UNS-3B 

x

1.37 [34.8]

 

4X Ø.313 [7.94] 

x

.31 [7.9]

(SPANNER WRENCH)

2.56 [65.0]

.38 [9.5]

n

2.25 [57.2]

n

6.06 [153.9]

3.50 [88.9]

.030 [0.8]

.12 [3.0]

90°

45°

3.53 [89.5]

1"-14UNS-3B 

x

1.37 [34.8]

 
 

1"-14UNS-3B 

x

1.37 [34.8]

 
 

12x 3/8-24 x 2.25 [57.2] 12 POINT FLANGE BOLT

CONNECTOR "B"
DUAL BRIDGE ONLY

CONNECTOR "A"
PTO2A-10-6P CONNECTOR
WIRING CODE: TYPICAL
PIN A +EXC.
PIN B +SIG.
PIN C -SIG.
PIN D -EXC.
PIN E N/C
PIN F N/C
 

1202, 1402 SERIES LOAD CELLS W/BASES

PTE

09.22.14

JSD

09.30.14

REVISIONS

REV

DESCRIPTION

ECO

NR

RELEASED FOR PRODUCTION - 10.06.14, PTE

43388

Содержание 1402-13ADB

Страница 1: ...LOAD CELL DUAL BRIDGE Installation and Operating Manual For assistance with the operation of this product contact PCB Piezotronics Inc Toll free 800 828 8840 24 hour SensorLine 716 684 0001 Fax 716 68...

Страница 2: ...repair User servicing or repair is not recommended and if attempted may void the factory warranty Calibration Routine calibration of sensors and associated instrumentation is recommended as this helps...

Страница 3: ...ry customer service representative Warranty All equipment and repair services provided by PCB Piezotronics Inc are covered by a limited warranty against defective material and workmanship for a period...

Страница 4: ...isclosure Table Pb Hg Cd Cr VI PBB PBDE O O O O O O PCB X O O O O O O O O O O O X O O O O O O O O O O O O O O O O O O O O O O O O O X O O O O O O O O O X O O O O O O O O O O O X O O O O O X O O O O O...

Страница 5: ...e O O X O O O Wires O O O O O O Cables X O O O O O Plastic O O O O O O Solder X O O O O O Copper Alloy Brass X O O O O O This table is prepared in accordance with the provisions of SJ T 11364 O Indica...

Страница 6: ...6 in x 3 50 in 153 90 mm x 88 90 mm 8 Weight 21 lb 9 53 kg Mounting Thread 1 14 UNS 3B No Metric Equivalent Sensing Element Strain Gage Strain Gage Mounting Torque 1400 in lb 158 Nm Deflection at Full...

Страница 7: ...10 3 12X THRU n5 125 130 2 B C 1 14UNS 3B x1 37 34 8 45 90 n2 59 65 8 1 75 44 5 n6 06 153 9 81 20 6 1 63 41 4 CONNECTOR A PTO2A 10 6P CONNECTOR WIRING CODE TYPICAL PIN A EXC PIN B SIG PIN C SIG PIN D...

Страница 8: ...LECTRICAL INSTALLATION 5 5 1 Electrical Drawing Western Regional Std 5 5 2 Cable Grounding Considerations 5 6 0 CALIBRATION 5 6 1 Calibration Certificate Description 5 6 1 1 Measured Output 6 6 1 2 Hy...

Страница 9: ...the parts under test have completed the planned fatigue test cycles 3 0 OVERVIEW Dual bridge fatigue rated load cells are specifically designed for repetitive testing Applications include material te...

Страница 10: ...ote that the performance of the load cell may be affected if the factory installed mounting base is removed or modified 4 2 Mounting Load Cell to a Standard Base or Custom Fixture If the load cell is...

Страница 11: ...ctor Protector 1 Remove the 4 40 x 1 4 button head cap screws from the connector using a 1 16 hex wrench as shown in Figure 7 2 Carefully pull the connector from the load cell Take care to not break o...

Страница 12: ...wiring may result in unstable or noisy signals A simple test with a voltmeter connected between the power cord ground and the structure on which the load cell is mounted can confirm that the structur...

Страница 13: ...s are adjusted such that the error due to eccentric loading is less than 0 1 per inch of offset Side loads moments and torque must be limited to avoid electrical or mechanical damage to the load cell...

Страница 14: ...tion certificate and adjust the span or gain until the display reads the force value stated on the certificate 4 Repeat steps 1 3 to verify that a valid calibration setting has been obtained 5 If poss...

Страница 15: ...ridge resistances A D excitation and B C the signal leads 9 Check bridge balance 10 Keep a record of your observations correct problems or contact PCB factory for assistance 11 2 1 Estimating Bridge B...

Страница 16: ...factory for any reason For calibration services if possible a copy of the purchase order covering the requested services should be included with the returned load cell 13 0 WARRANTY Standard warranty...

Отзывы: