![PAW HeatBloC K34 DN 25 Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/paw/heatbloc-k34-dn-25/heatbloc-k34-dn-25_installation-and-operation-instructions_764039012.webp)
3 Product description
12
993x063x-mub-en – V01
2017/01
12.
Turn the cover plate (4) such that the marking PAW is at the bottom
and that the scale is positioned as shown on the figure above.
13.
Fix the cover plate (4) by using the screws (3).
14.
Put the rotary knob (2) onto the cock rod.
15.
Fix the rotary knob (2) on the cock (8) by using the screw (1).
Retrofitting and commissioning of the heating circuit
1.
Interchange the return pipe (D) and the flow pipe with the pump (B).
Consider the flow direction of the pump!
Turn the pump head such that the terminal box is directed to the top or to the centre
of the group of fittings.
2.
Dismount and interchange the ball valves.
3.
Mount the HeatBloC and connect it to the installation.
4.
Check all union nuts before commissioning and firmly tighten them if necessary.
5.
Mount the insulation only after having carried out a pressure test.
Mount the thermometer handles (A-2, F-2) in a final step.
Mixing valve with flow on the right
Mixing valve with flow on the left
Flow
Flow
Содержание HeatBloC K34 DN 25
Страница 22: ...6 Technical data 22 993x063x mub en V01 2017 01 ...
Страница 23: ...6 Technical data 2017 01 993x063x mub en V01 23 ...