7 Commissioning [specialist]
2015/12
996404631-mub-en - V02
17
8.
Open a withdrawal point for domestic hot
water (for example a tap) with a flow rate of
at least 10 l/min and let the water run for
about 2 minutes to deaerate the secondary
circuit. Then close all withdrawal points in
the secondary circuit.
9.
Make sure that the domestic hot water
module is correctly integrated into the
potential equalisation of the installation.
10.
Set the desired domestic hot water
temperature in the controller
(see page 24).
11.
The domestic hot water module is now ready
for operation.
Secondary circuit