4
SmartNode 10100A Series Quick Start Guide
1.0 Before you begin
In the box, you will find:
•
One SmartNode SN10100A
•
One set of mounting brackets with screws
•
One DB-9 to RJ-45 adapter
•
Three CAT5 Ethernet straight cables (male-male), three meters in length
•
One warranty sheet
•
One packing slip
•
One SmartNode SN10100A Series Quick Start Guide
•
One SmartNode SN10100A Important Notice sheet with unique information for your
specific unit
2.0 Installing the rack hardware
1.
Install rack-mounting hardware on to the SN10100A and install the unit on the
equipment rack.
2.
Connect the Ethernet port to your management network.
Figure 1.
Installing the SN10100A
3.0 Connecting to the VoIP Network
1.
Connect the VoIP Ports 0/1 and 0/1 to your network (see
figure 2
).