Working with Configurations
38
SmartNode 10100 Series User Manual
3 • Initial Setup and Web Management
3.
Click the
Status
tab to activate the application.
Figure 28. Application Status
4.
Set the
Oam target state
to
Run
.
5.
Click
Apply States
.
Figure 29. Apply States
Verifying that an Application is Operating
When an application’s target state is set to run, there are a number of crucial verifications that you should con-
duct in order to verify an application is running properly. These verifications are as follows:
•
Verify the application’s current path.
It is important that once the application has been set to run, a path is
displayed.
•
Verify the TDM interface.
If you are running a TDM application on your Smart Media unit then you can
verify the TDM interface. Although, you most likely have not yet configured the TDM interface of the
Smart Media unit, certain status LEDS will indicate that your application is operational.
•
Verify the IP Interfaces.
Your Smart Media unit is furnished with two IP interfaces for access to a VoIP net-
work. Although you have not as of yet configured the interfaces, certain LED indications will be displayed.
See
below.
Figure 30. SN10100 Interfaces