Planning the Installation
18
SmartNode 10100 Series User Manual
2 • Hardware Installation
Planning the Installation
Supplies
In the SN10100 box, you will find:
•
One SN10100
•
One set of mounting brackets with screws. These are used for mounting a SN10100 on a 19” rack.
•
One DB-9 to RJ-45 adapter. Allows you to interface the serial port of your computer with the RJ-45 con-
sole port of the SN10100.
•
Three CAT5 Ethernet straight cables (male-male), three meters in length.
•
One warranty sheet
•
One packing slip
•
One SN10100 Quick Start guide
Not included with the SN10100:
•
No power cords are supplied for AC units. Two DC power cables are included with DC units.
•
A 19” equipment rack. You must use a standard 19” wide equipment rack to install the SN10100.
Procedures
To install the SmartNode 10100, follow these steps:
1.
Mount the SmartNode 10100 on an equipment rack (See
“Mounting the SN10100 to a Rack”
2.
Connect the management interface (See
“Connecting the Management Interface”
3.
Connect the VoIP ports to the network (See
“Connecting to a VoIP Network”
4.
Connect the correct interfaces to the PSTN (See
5.