background image

Model 3088A Series Quick Start Guide

3

1.0  Select configuration method

Before powering up, you must select one of the following methods for configuring your OnSite:

Plug ‘n’ Play

—The OnSite comes factory-configured for Plug ’n’ Play configuration when connected to a 

service-provider network.

DIP Switch

—For deploying the OnSite in back-to-back applications. To use DIP-switch configuration you 

must first set the DIP switches to a position other than all OFF or all ON before powering-up the OnSite. To 
configure your CPE using the DIP switches, refer to the section entitled “Hardware (DIP-switch) configuration” 
in the 

OnSite Model 3088A Series User Manual.

Software Configuration

—Allows you to modify configurable parameters by connecting a PC to the con-

sole port and issuing software commands. To use software configuration you must set all the DIP switches to 
the ON position before powering-up the OnSite. To configure your CPE via the console port, refer to section 
“Software (CLI) configuration” in the 

OnSite Model 3088A Series User Manual.

2.0  Power up the CPE

Your G.SHDSL.bis CPE comes with one of the following power supply options:

External AC adaptor with detachable power cord

External DC power supply with terminal block connector (model 48V-PSM3)

2.1  Models with external AC adaptor

   1.

Connect female plug of the AC power cord to the AC adaptor provided.

   2.

Connect the barrel-type connector of the AC adaptor to the 

Power

 connector on the OnSite.

   3.

Insert the male plug of the AC power cord into an AC power outlet (100–240 VAC).

2.2  Models with external DC power supply

The 36-60 VDC DC to DC adapter is supplied with the DC version of the Model 3088A.  The black and red leads 
plug into a DC source (nominal 48VDC) and the barrel power connector plugs into the barrel power supply jack 
on the 3088A. (See 

figure 1

).

Figure 1. 

DC Power Supply

To Power

Supply Jack

To -48VDC

Source

-Vin

+Vin

SWITCHING POWER SUPPL

Y

MODEL

 : SYD1

106-0505

INPUT

 : 36-60V      0.2A

 MAX

OUTPUT

 : +5V       1.0A

OUTPUT

 POWER : 5W MAX

S/N

: G01234567890

                             

MADE IN CHINA

 BY

 SUNNY

Black lead (-V)

Red lead (+V)

Barrel power connector

Содержание OnSite 3088A

Страница 1: ...intended for use in a light industrial environment It is not intended nor approved for use in an industrial or residential environment REGULATORY MODEL NUMBER 03340D4 001 Part Number 07M3088A QS Rev...

Страница 2: ...ices ensure that the interconnecting cables are rated for proper voltage current anticipated temperature flammabil ity and mechanical serviceability WAN LAN PSTN ports connections may have hazardous v...

Страница 3: ...console port refer to section Software CLI configuration in the OnSite Model 3088A Series User Manual 2 0 Power up the CPE Your G SHDSL bis CPE comes with one of the following power supply options Ext...

Страница 4: ...Plug one end of the cable into the RJ 45 socket labelled DSL on the OnSite CPE If you are connecting to a DSL service plug the other end of the cable into the RJ 45 wall socket that provides your G SH...

Страница 5: ...of the serial cable to the female serial connector on the OnSite 2 Attach the other end of the cable to the serial connector on the local serial CPE Note You can connect the V 35 interface to an M 34...

Страница 6: ...equipment causes interference to radio or television reception which can be determined by disconnecting the cables try to correct the interference by one or more of the fol lowing measures moving the...

Страница 7: ...hung der Rechtsvorschriften der Mitgliedstaaten ber Funkanlagen und Telekommunikations Endeinrichtungen und die gegenseitige Anerkennung ihrer Konformit t Die unterzeichnete Konformit tserkl rung kann...

Страница 8: ...ne support is available five days a week from 8 00 am to 5 00 pm EST 1300 to 2200 UTC GMT by calling 1 301 975 1007 Support via VoIP Contact Patton free of charge by using a VoIP ISP phone to call sip...

Отзывы: