Modu-Fire
®
Gas-Fired Boiler
Table of Contents
1.0 INTRODUCTION ................................. 1
2.0 SAFETY............................................... 1
2.1 General ................................................1
2.2 Training................................................1
2.3 Safety Features ...................................1
2.4 Safety Labels .......................................1
2.5 Safety Precautions...............................1
2.5.1 Electrical Hazards ..........................1
2.5.2 Burn, Fire, and Explosion Hazards ..1
2.5.3 Crush Hazards ...............................1
2.5.4 Chemical Hazards .........................1
2.5.5 Pressure Hazards ..........................1
2.5.6 Slip, Fall Hazards...........................1
3.0 INSTALLATION ................................... 2
3.1 Receiving and Storage ........................2
3.1.1 Initial Inspection ..............................2
3.1.2 Storage Prior to Installation ...........2
3.2 Compliance with Codes .......................2
3.3 Setup ...................................................2
3.3.1 Foundation .....................................2
3.3.2 Placement ......................................2
3.3.3 Clearances.....................................2
3.4 Electrical Connections .........................2
3.5 Combustion Air ....................................2
3.6 Flue Venting.........................................2
3.6.1 Vent Elbows ...................................2
3.6.2 Barometric Damper........................2
3.6.3 Barometric Damper Location .........2
3.6.4 Flue Connection.............................2
3.6.5 Vent Termination ...........................2
3.6.6 Removing an Existing Boiler ..........2
3.7 Gas Piping ............................................2
3.7.1 Gas Supply Piping by Installer .......3
3.7.2 Gas Bleeds and Vents ................... 3
3.8 Boiler Water Piping .............................. 3
3.8.1 Piping Design................................. 3
3.8.2 Boiler Inlet and Outlet Connections.. 3
3.8.3 Boiler Water Piping by Installer...... 3
3.8.4 Flushing and Filling........................ 3
3.9 Burner and Ignition System ................. 3
3.9.1 Inspection ...................................... 3
3.10 Pre-Start Check List........................... 3
3.11 Safety Checks.................................... 3
3.11.1 Test of Ignition Safety System ..... 3
3.11.2 Test of Low Water Cut-off ............ 4
3.11.3 Test of High-Limit Control ............ 4
3.11.4 Test of Gas Pressure Switch ....... 4
3.12 Initial Adjustments.............................. 4
3.12.1A – Configuring the Controller ....... 4
3.12.2 Air Flow Adjustments ................... 9
3.12.3 Gas Pressure Adjustment ............ 9
4.0 OPERATION ......................................10
4.1 General .............................................. 10
4.1.1 Control Panel Front...................... 10
4.2 Lighting and Shut-Down Procedures . 10
4.2.1 Lighting Procedures..................... 11
4.2.2 Normal Shut Down Procedures ... 11
4.2.3 Emergency Shut Off .................... 11
4.3 Typical Boiler Operating Conditions .. 11
5.0 MAINTENANCE .................................12
5.1 Maintenance and Inspection Schedule 12
5.1.1 Daily............................................. 12
5.1.2 Weekly ......................................... 12
5.1.3 Monthly (During Operation) ......... 12
5.1.4 Semi-Annually.............................. 12
5.1.5 Annually ....................................... 12
Содержание THERMIFIC MODU-FIRE
Страница 11: ...Modu Fire Gas Fired Boiler Installation 8 Table 1 Table of Parameters ...
Страница 20: ...Modu Fire Gas Fired Boiler Parts Technical Support Standard Unit w Siemens Control 17 ...
Страница 21: ...Modu Fire Gas Fired Boiler Parts Technical Support Standard Unit w Remote Control 18 ...
Страница 22: ...Modu Fire Gas Fired Boiler Parts Technical Support IRI with Siemens Control 19 ...
Страница 23: ...Modu Fire Gas Fired Boiler Parts Technical Support IRI with Remote Control 20 ...