Instructions
1005101738
ENVI to NURO
Date: 12/19/2017
Revision A
NURO Conversion Instructions
MACH C1500-C2000H
8. Disconnect all wires from internal safety devices and sensors. Take note to wire colors
for sensors as new panel will use same colors for sensor wires.
9. Control panel can now be slid right, lifted off screws, and removed from boiler.
10. Using a 1/2
” wrench, remove and replace high and low gas pressure switches (Figure 4)
provided in kit. Be sure to apply gas thread sealant to new switches (Figure 5).
Replace existing
high and low gas
pressure switches
Figure 4
Figure 5
Содержание MACH C1500
Страница 18: ...Instructions 1005101738 ENVI to NURO Date 12 19 2017 Revision A NURO Conversion Instructions MACH C1500 C2000H...
Страница 19: ...Instructions 1005101738 ENVI to NURO Date 12 19 2017 Revision A NURO Conversion Instructions MACH C1500 C2000H...
Страница 20: ...Instructions 1005101738 ENVI to NURO Date 12 19 2017 Revision A NURO Conversion Instructions MACH C1500 C2000H...