Patriot Docks Gangway Скачать руководство пользователя страница 3

Step 1.  

Once Frame is loosely assembled, 

mount the pipe bracket to the 4x8’ low-pro 
frame using M10x60mm bolt/nut. Mount at 
each end of the 8’ Side Rail.

Step 2.  

Install Handrail Vertical Supports in 

the pipe bracket.  Handrail Vertical 
Supports can be orientated inside the 
Gangway or outside. Both ends should be 
set equally, then tighten set screws.

Step 3.  

Install each horizontal aluminum 

pipe through the sleeves on the Handrail 
Vertical Supports and into position. Tighten 
set screws.

3

(651) 674-2450

[email protected]

Scan for Online Help: 
FAQ, Online support

Frame Assembly

Gangway

4’ Frame Assembly:

-Unwrap frame and components. Lay out the 
pieces as shown to the right. Following that 
diagram, align each tube so the labeled letters 
match up in all 4 corners. Angles are numbered 
to correspond with the diagram. Align angles, 
and assemble using M10x60mm Bolt/Nut.

-TIP: Loosely tighten bolts/nut. Pipe Bracket and 
Low Pro Transition Inserts (16’ Gangway) will 
share bolts/nuts.

8’ Frame Assembly:

-Unwrap shore ramp frame and components. Lay 
out the pieces as shown. Angle brackets are 
numbered to correspond with picture below. The 8’ 
ramp has corner angles with a gusset welded to the 
bottom. Use M10x60mm bolts/nuts, assemble 
frame using angles.

-TIP: Loosely tighten bolts/nut. Pipe Bracket and 
Low Pro Transition Insert (16’ Gangway) will share 
bolts/nuts.

A

A

B

B

C

C

D

D

8

8

7

7

5

5

Side Tube

Side Tube

Отзывы: