manualshive.com logo in svg
background image

4-Step Ladder

Installation

Mounting to Truss Frame:
To mount the 4-Step Ladder to PN10800 Patriot Truss Frame first choose 
the desired location. Align one side with the 7/16” holes in the vertical 
angle on the Truss Side Frame. Mark the hole locations on the opposite 
side of the ladder, set ladder aside and drill 7/16” holes. Mount Ladder 
using four M10x60mm mounting bolts (DD).

Tip: Each box will come with a template built into it, cut out template and 
use to mark mounting hole locations. Some templates may be damaged 
during shipping, if so use original method above.

Mounting to Low Profile  Frame:
To mount the 4-Step Ladder to PN10835 Low Profile Frame first choose the 
desired location. Some things to consider when choosing your location. The 
Shepherd Handle must line up with the open gaps in the 4’x4’ deck panel. This is 
so you can run a bolt through and attach the Pinch Plate (E). Once location is 
determined place ladder on frame, use pre-drilled mounting hole if available. If 
none are available mark hole locations and drill 7/16” holes. Mount ladder using 
M10x90mm bolt/nuts (FF). Next, secure ladder to decking using Pinch Plate (E) 
under the Shepherd Handles and the decking. Secure Pinch Plate to the Shepherd 
Handle using M6x80mm bolt/nuts (EE). 

Mounting to a Wood Dock:
To mount the 4-Step Ladder to a wooden dock, choose desired location and either mark and pre-drill 7/16” holes for mounting with 
bolts/nuts or us 3/8” lag screws. The 4-Step Ladder also has mounting holes in the Shepherd Handles for fastening between deck 
boards or directly to the deck board for added support.

Mount the ladder to the dock frame. 

4

Scan for Online Help: 
FAQ, Online support

(651) 674-2450

[email protected]

Отзывы: