50
51
Wall mount Signal Tower Instruction Manual
8. Operation
Point
●
If each control operation is executed at the same time, it is executed in the following priority order.
・
Clear > Signal Tower motion control > Detailed motion control
・
When register address 17 (11H) "Signal Tower pattern (all tiers)" and register addresses 19 (13H) to 22 (16H) "Signal
Tower pattern (1 to 4 tiers)" are used, register address 17 (11H) "Signal Tower pattern (all tiers)" has priority.
●
When the clear is executed, the light is off and the buzzer is muted.
●
All high data readings are set to 00H.