BEFORE YOU BEGIN
PLAN AHEAD
02
Owner's Manual
Before beginning construction, check local building codes regarding footings, location and other
requirements.Study and understand this owner's manual. Important information and helpful tips will
make your construction easier and more enjoyable.
Watch the Weather:
Be sure the day you select to install your building is dry and calm.
Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground.
Finish:
For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as
soon as you notice them on your unit. Irnmediately clean the area with a wire brush; wash it and
apply touch-up paint per manufacturer's recommendation.
Teamwork:
Whenever possible, two or more people should work together to assemble
your building. One person can position parts or panels while the other is able to handle the
fasteners and the tools.
Tools and Materials:
These are some basic tools and materials you will need for the
construction of your building. Decide which method of anchoring and the type of foundation
you wish to use in order to form a complete list of the materials you will need.
CARE & MAINTENANCE
Assembly Instructions:
Instructions are supplied in this manual and contain all appropriate
information for your building model. Review all instructions before you begin.and during assembly,
follow the step sequence carefully for correct results.
Parts and Parts List:
Check to be sure that you have all the necessary parts, you're your building
Separate contents of the carton by the part number while reviewing parts list.
The first few steps show how to join related parts to make larger sub
assemblies which will be used later.
Familiarize yourself with the hardware and fasteners for easier use during
construction.
These are packaged within the carton. Note that extra fasteners have been supplied for your
convenience.
Roof:
Keep roof clear of leaves and snow with long handled, soft-bristled broom, Heavy amounts of
snow on roof can damage building making it unsafe to enter. In snow country, Roof Strengthening
Kits are available for most Arrow Buildings for added protection against heavy snow accumulation.
Doors:
Always keep the door tracks clear of dirt and other debris that prevent them from sliding
easily. Lubricate door track annually with furniture polish or silicone spray, Keep doors closed and
locked to prevent wind damage.
Fasteners:
Use all washers supplied to protect against weather infiltration and to protect the metal
from being scratched by screws. Regularly check your building for loose screws, bolts, nuts, etc, and
retighten them as necessary.
Moisture:
A plastic sheet (vapor barrier) placed under the entire floor area with good ventilation will
reduce condensation.
Other Tips....
Wash off inked part numbers on coated panels with soap and water
Silicone caulking may be used for watertipht seals throughout the building.
Do not store swimming pool chemicals in your building, Combustibles and corrosives must be
stored in air tight approved containers.
Содержание T-PS23-0230
Страница 5: ...18 X2 17 X2 US1 X1 16 X1 15 X1 05 STRIPS DF X1 DC X2 STANDARD DH X4 DG X1 V1 X115 GC X4 GS X1 V2 X175...
Страница 6: ...M4x10 M4x10 M5x12 06 F1 X215 SCREW F2 X8 F3 X32 F4 X5 M4x16 F5 X4 M6x10...
Страница 8: ...BS2L BS2L BS2L BS2 BS2 F1 F1 BS1 BS1L BS1 F1 F1 BS1L BS1 F1 X2 F1 X2 STEP 1 STEP 2 08 BS2...
Страница 10: ...F1 X3 STEP 5 10 STEP 6 F1 V2 WS2A WS2A WS2A F1 WS2A V2 BS1 BS1 V2 X3 F1 X3 V2 X3...
Страница 11: ...STEP 7 F1 X4 V2 X4 STEP 8 F1 X4 V2 X4 11 F1 V2 WS2A WS2A F1 V2 BS1 BS1...
Страница 14: ...STEP 13 14 F1 X4 V2 X4 ULA ULA F1 V2 F1 V2 ULA ULA ULA...
Страница 15: ...STEP 14 15 F1 X4 V2 X4 F1 F1 V2 V2 UR1 UR1 UR1 UR1 UR1...
Страница 18: ...F1 X36 V2 X36 STEP 18 18 F1 V2 P4 P2 P3 P2 P1...
Страница 19: ...F5 X4 F1 X2 V2 X2 STEP 19 19 x2 v2 F1 17 18 x4 F5 17 16 GC 18 17 16 15 F5 17 18...
Страница 21: ...F3 X8 F1 X4 STEP 22 21 F1 F1 F1 DH DH DLA X2 F3 DX2 DX2...
Страница 22: ...F1 X8 STEP 23 22 F1 DC DC DC DC...
Страница 24: ...STEP 26 24 F3 X8 F1 X4 DH DH DRA 20 20 DX2 DX2 X2 F3...
Страница 25: ...STEP 27 25 F3 X16 DRA DLA X4 F3 UR1 DRA...
Страница 26: ...STEP 28 26 V1 X115 V1 V2 F1...