BEFORE STARTING ASSEMBLY
Remove all of the pieces from the 4 packages and spread them out on the ground.
Before installation, please check the type and quantity of parts first.
It is recommended to use a clean work surface to spread the parts out and for
pre-assembly steps. Review all instructions before you begin, continue to refer to
instructions during assembly.
Be sure to follow all steps thoroughly.
Please prepare these components in advance at the beginning of each stage.
REQUIRED TOOLS
CAUTION
Some parts have steel edges. Please be careful when handling components.
Always wear work gloves, eye protection and long sleeves when assembling
or performing any maintenance on your shed. Do not attempt assembly on days
with strong winds or low temperatures.
03
Requires two people and takes 2-3 hours for Installation.
Recommended to wear gloves to avoid scratches.
Please read the manual carefully before installation.
DO NOT RETURN YOUR UNIT
TO THE STORE
Contact us first
Содержание T-PS22-0096
Страница 5: ...DLB X1 05 DRB X1 DRA X1 DLA X1 PLATES STRIPS UR1 X1 7 X1 9 X4 DX2 X4 UL1 X1 8 X1 10L X1 10R X1...
Страница 6: ...06 STRIPS 16 X2 18 X2 19 X2 14 X4 13 X4 15 X2 17 X2 20 X4 B3 X2 GS X2 B1 X4 B2 X2...
Страница 9: ...Bottom frame 10 12 page Wall 12 20 page Roof 21 30 page Door 31 36 page CONTENTS 09...
Страница 27: ...P2 3 V2 V2 X57 F1 X57 STEP 29 F1 19 19 V2 X1 F1 X1 STEP 28 27 P3 P3A P4 P5 P1 A B B A Big P4 A small...
Страница 34: ...F1 X8 STEP 40 34 F1 DC DC DLB DLA...
Страница 37: ...37 STEP 44 F1 S1 S1 X120...