![PAT America DS 350 Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/pat-america/ds-350/ds-350_operators-manual_761967021.webp)
Operation
© PAT Rev. 7 06/18/01 // MO
191319_7.DOC
17
5 OPERATION
After having set the LMI to the actual crane configuration, the system is ready for operation. The
display shows the LMI screen (example for value representation).
reeving
(parts of line)
operation code
number
boom length
tip height
boom angle
radius
max. load
actual load
utilization bargraph
only for cranes
with boom
control system
Содержание DS 350
Страница 4: ... ...
Страница 10: ...Operator s Manual DS 350 1319 PAT Rev 7 06 18 01 MO 191319_7 DOC 6 Fig 2 Operating Console ...