ASLD2200 - Instruction Manual
5 Installation
5.1 Location
The ASLD2200 is housed in an IP55 GRP outer enclosure and is suitable for mounting on the bridge of settlement
tanks. The electronics for the monitor are housed within an inner IP65 enclosure.
It is recommended that the monitor be mounted approximately half way between the centre and the outside wall of the
tank, on the leading edge. This offers allows the system to monitor the true settled interface whilst minimising the
effect of disturbance caused by incoming sludge and by the tank scraper.
It is normal for the 4-20 mA output signal to be transmitted via slip rings to the site control system, where this is not
possible Partech are happy to offer a radio telemetry system for transmission directly to the desired point.
Partech offer a mounting bracket shown below that allows easy attachment to tank handrails.
The ASLD2200 weighs 15 kg and can be difficult to handle, it is advisable to have assistance when
installing this instrument.
Do not lift the ASLD2200 by its cable drum.
Page 12 of 30
103370IM Issue 10 Date 19/03/2018
TYPICAL MOUNTING ARRANGEMENT & BRACKET DETAIL