Breaking in engine
Your new engine requires a period of break-in to allow mating
surfaces of moving parts to wear in evenly.
Caution
Failure to follow the break-in procedure could result in reduced engine life or even
severe engine damage.
1. For the first hour of operation: Run the engine at 2000 r/min or at approximately half
throttle.
2. For the second hour of operation: Run the engine at 3000 r/min or at approximately
three-quarter throttle.
3. For the next eight hours of operation: Avoid continuous operation at full throttle for more
than five minutes at a time.
4. Operate the engine normally.
Содержание F15HP
Страница 1: ...PARSUN F15 F9 9HP OUTBOARD MOTOR INSTALLATION OPERATION DEMO...
Страница 2: ...Please check there is no damage on the carton...
Страница 5: ...EXTERNAL FUEL TANK 2 AIR VENT SCREW 3 FUEL TANK CAP 1 FUEL TANK 5 FUEL GAUGE 4 FUEL CONNECTOR...
Страница 10: ...Neutral throttle lever FULL OPEN FULL CLOSE...
Страница 23: ...WARNING Do not start the engine out of water Overheating and serious engine damage can occur WITHOUT WATER FUEL...
Страница 26: ...3 Place the gear shift lever in neutral...
Страница 28: ...4 Put the throttle grip at start position Align the mark MARK FW Put the main switch to 0N postion...
Страница 31: ...FW model Turn the main switch to START start and hold it for a maximum or 5 seconds...
Страница 39: ...2 Tighten the air vent screw on the fuel tank cap 3 Disconnect the fuel line...