Disassembling and inspection
1. Remove rubber plug, wave sheath and throttle cable jacket.
2. Remove bolts fixing bottom cowling cover board, and remove cover board.
3.
Remove top cowling locking handle assembly screws, remove top cowling locking handle and top
cowling locking block.
4.
Remove top cowling locking handle bush A and top cowling locking handle bush B.
5.
Remove wave washer.
6.
Remove fixing bolt of shift rod bracket.
7.
Remove cotter pin of shift rod.
8.
Remove shift rod, spring pin and stopping rocker.
9.
Remove spring and stopper spring.
10.
Inspect bottom cowling for crack or damage. Replace if necessary.
11.
Inspect top cowling locking handle and top cowling lock block for crack or damage. Replace if
necessary.
12.
Inspect wave washer and locking handle bush for crack or damage. Replace if necessary.
13.
Inspect shift rod bracket and stopping rocker for crack or damage. Replace if necessary.
14.
Inspect spring and stopper spring for crack, crank or damage. Replace if necessary.
74
Содержание F15BM
Страница 1: ...PARSUN OUTBOARD ENGINE SERVICE MANUAL F15 F9 9BM F15 F9 9W SUZHOU PARSUN POWER MACHINE CO LTD...
Страница 13: ...DETECTION DEVICE Digital tachometer Digital circuit tester Peak voltage adaptor 7...
Страница 36: ...EXPLOSIVE DRAWING REMARKS PART NO DESCRIPTION 30...
Страница 37: ...REMARKS DESCRIPTION PART NO 110 Nm O M6x20 mm 8Nm O 18 Nm 31...
Страница 38: ...PART NO DESCRIPTION REMARKS 18 Nm O M6x20 mm 8Nm O 110 Nm 32...
Страница 39: ...Electric start type PART NO DESCRIPTION REMARKS 30 Nm 33...
Страница 40: ...PART NO DESCRIPTION REMARKS 34...