19
Installation
Selection of installation equipment
Cut out the work surface according to the sizes shown in the drawing.
For the purpose of installation and use, a minimum of 50mm space shall
be preserved around the hole.
Be sure the thickness of the work surface is at least 30mm. Please select
heat-resistant work surface material to avoid larger deformation caused
by the heat radiation from the hotplate.
L(mm) W(mm) H(mm) D(mm) A(mm) B(mm) X(mm)
900 520 51 47
870
+4
+1
490
+4
+1
50 min
Make sure the hob is well ventilated and the air inlet and outlet are not blocked.
When installing a rangehood above an appliance, all
relevant New Zealand building, installation and regulation
standards including NZS 5261 must be adhered to.
Dear Installer:
Please affix data label provided on the adjacent cupboard near
the appliance for future reference. Thank you.