GB/IE 63
Select
each watering day
and confirm by pressing the
SET
button
4
(see Fig. 11).
After select the watering days, press the
button
6
to
final confirm.
The display on the
“Prog”
will flash on screen.
9. Select the
“Prog ON”
with the rotary button and confirm
by pressing the
SET
button
4
(or you can select OFF if
you don’t want to activate the program at this moment).
After setting up the first program, the system will now jump
back to step 2, so you can set up program No. 2–6.
When you have finished setting up the programs, you can
press the (ON/OFF) button
7
to exit the programming
mode and go back to the normal operation mode.
Remark:
In case you input a wrong data, you can always
press the (ON/OFF) button
7
to go to previous step.
Manual operation for watering
The valve can
be opened or closed manually
at any
time. A program-controlled open valve can be closed early
without changing the program data (watering start time, run
time and frequency).
Содержание 352082 2007
Страница 3: ...A C 4 9 11 10 8 SET B 12 13 16 17 15 14 3 4 6 7 18 8 1 2 7 3 6 5...
Страница 4: ...D 9 10 11 1...
Страница 150: ...150 NL BE Service Belgi Tel 080071011 Tel 80023970 Luxemburg E Mail owim lidl be...
Страница 288: ...288 ES Asistencia Asistencia en Espa a Tel 900984948 E Mail owim lidl es...
Страница 321: ...1 2 3 4 5 6 7 8 9 10 11...