24
1
2
25
3
4
Remove the securing screw from the fan cover on the main
body.
Align the lug on the main body with the lug locator on the
intake pipes and slide it on to the body. Again this may take
some force as it is necessary to make a tight seal.
ATTACH INTAKE PIPES TO BODY
REMOVE FAN COVER SCREW
VACUUM ASSEMBLY
TWIST & LOCK PIPES TOGETHER
Once the lug is pushed all the way into the locator twist the
intake pipes in opposite directions. this will lock the lug into
position.
Locate intake pipes pipes C&D and connect the two blower
pipes.
Firstly align the lugs with the lug locators. The pipes are a
tight fit to ensure a tight seal so it may take some force to
slide the lug into the locator.
ALIGN & CONNECT INTAKE PIPES
VACUUM ASSEMBLY
• Replace the securing screw from the fan cover after the intake pipes have been attached in order for safe keeping.
• The pipes are a tight fit to ensure a tight connection this is so the machine works at its optimum whilst in use.