Page 4
– Bulletin 100-50-11.1
with local, state and federal regulations. The power
requirements are described below. See Appendix
B for more details on specific power specifications.
• Voltage: 100-240 VAC, 50-60 Hz
• SCS-PB Power Requirement: 1.5W for controller
+ Pulse Valve Power Rating (31W max)
• SCS-SB Power Requirement: 4W
⚠
WARNING:
Route and secure cables away
from hot surfaces, high voltage lines, and moving
components. Use caution when working around high
voltage components. Safety covers should be used
for personal safety on high voltage panels. Ensure the
wires are not placed close to any sharp or abrasive
objects to avoid any nicking, scraping, or cutting of
the wire insulation. Secure all wires to prevent pulling
or applying tension to the wires.
A. TECH CHECK SETUP
1. Download the Sporlan Tech Check app. Search
for ‘Sporlan Tech Check’ on the app store.
4. Once your email is verified, open the Tech Check
app and either click ‘Reload’ or log in using your
email address and password.
7. Once access is granted, the setup will be
complete. Tap the back button to return to the
home screen of the app.
3. Setup
Setup of the SCS series of controllers is done using the Tech Check app for Apple mobile devices.
You will need a mobile device with Bluetooth LE capability.
2. Click on the ‘Register’ tab
and create an account by
entering the following and
then tapping ‘Register’ in
the top right:
a. Email Address
(will need to be verified)
b. Password
c. Company name
d. Your full name
3. A verification email is sent
to the email address that
you provided. Open your
email application and
click the link in the email
to verify your account.
5. Once you are logged into
the app you will need to
request access to the
various products that the
Tech Check app supports.
To do this, click on the
gear icon at the top right
of the screen.
6. Tap on ‘Request SCS
access’ and wait for the
access to be granted. It
should take less than a
minute with an established
cellular connection.