33
Troubleshooting
GPS LED
Pattern
Description
Red solid
Indicates error (also red during programing)
Red Slow Blink
Gateway booting, in process of booting GPS firmware
Blinking Yellow
GPS firmware booted. Searching for Satellites
Cellular LED
Red solid
Indicates error (also red during programming)
Red Slow Blink
Software booting or no sim card installed
Yellow blink
Establishing connection with carrier
Green blink
Connected to cellular tower
Green solid
Connected to internet
WiFi LED
Red solid
Indicates error (also red during programming)
Off
Disabled
8.2. Troubleshooting
Listed are common troubleshooting steps for the PVSG-IQAN gateway to ensure the
application of the gateway is correct. If any of the steps do not solve the issue that the user
is experiencing, please contact support.
8.2.1. Users gateway will not connect to a cellular network.
•
If the Cellular LED is a slow red blink after more than 1 minute.
o
Check to ensure the factory installed SIM card has not been removed or
become dislodged.
•
If the gateway is stuck on the yellow blink pattern for greater than 2 minutes:
o
Check the antenna is properly attached to the correct antenna lead. If there
are any extensions in the antenna ensure they have not become
disconnected or damaged.
o
Occasionally when the gateway moves from one carrier network to another it
requires a power cycle.
•
If the cellular LED is a green blink for more than 5 minutes.
o
Ensure the device is in an area with strong cellular coverage
Содержание PSVG-IQAN-C2E1M2W1U1
Страница 1: ...Parker Gateway for Mobile IoT Solution PSVG IQAN C2E1M2W1U1 User Guide...
Страница 10: ......
Страница 50: ...40 PSVG IQAN C2E1M2W1U1 Markings Approvals 9 4 EU Declaration of conformity...
Страница 51: ...41 Markings Approvals...
Страница 52: ...42 PSVG IQAN C2E1M2W1U1 Appendix 10 Appendix...
Страница 55: ......
Страница 56: ...HY33 5027 IB US...