In this chapter you can read about:
Preparations for substructure ........................................................................................... 11
Fitting / mounting ............................................................................................................. 12
The linear module is furnished completely mounted and mechanically ready-to-
operate.
If no Parker drive is provided, attach your motor-gearbox combination according to
the instructions of the respective supplier.
The technical data must be respected.
Technical data: See in the catalog section (following the mounting instructions).
2.1
Preparations for substructure
Each holding point must be even with a flat parallelism of 0.2 mm. All holding points must be aligned
with parallelism to each other of better than 0.5 mm.
To simplify installation and adjustment, the holding points for the linear actuator can also consist of
adapter plates. They can be aligned with tightening and pressure screws.
Deflection vs. distance between mountings and payload
LCB040
(1): Maximum permitted deflection
Fn
Fn
SA
SA
SA
(1)
0
500
1000
1500
2000
2500
3000
Stützabstand SA [mm]
K
ra
ft
F
n / N
0,1
1,0
10000,0
10,0
100,0
1000,0
0,
1 m
m
0,
2 m
m
0,
3 m
m
0,
5 m
m
1,
0 m
m
Distance between mountings SA [mm]
Fo
rce F
n /
N
0.1
1.0
10000.0
10.0
100.0
1000.0
0.
1 m
m
0.
2 m
m
0.
3 m
m
0.
5 m
m
1.
0 m
m
2. Commissioning