Parker EME
Set-up
192-510014 N04 March 2010
11
LCB060
0,1
1,0
10000,0
0
500
1000
1500
2000
2500
3000
3500
4000
K
ra
ft
/
F
o
rc
e
F
n
[
N
]
10,0
100,0
1000,0
0,
20
m
m
0,
30
m
m
0,
50
m
m
1,
00
m
m
2,
00
m
m
Stützabstand / Distance between mountings SA [mm]
(1)
(1): Max. permissible deflection
2.2
Fitting / mouting
2.2.1.
Installation of a single actuator
Caution
Danger when transporting long actuators. Because the actuator bends under its own
weight, guiding accuracy may deteriorate significantly. In addition, the shape of the profile
may change and the travel behaviour of the sliding carriage may be negatively affected.
Additional information on trans-port:
Hint
When fitting the LCB into your plant, please make sure that the deflection station and the
sliding carriage are accessible for maintenance! (Provide enough space behind the
deflection station so that the sliding blocks or the sliding carriage can be removed).
Take the linear module out of the shipping crate.
Place the LCB on the connection points, which have been previously levelled
(water level, levelling device).
Fasten the actuator in place. (
LCB Mounting Options
(see page 11))
Fasten the connection parts in place.
Hint
There are two ways to fasten the LCB in place.
Mounting with clamping profiles or
With T slot bolts/nuts that are guided into the grooves of the aluminium
profile.