
Safety Information
EN
8
4 Operating the equipment
4.1 Overview of Controls
4.2 Starting the equipment
1.
Ensure that the isolation valves on the inlet and the outlet of the dryer are closed.
2.
Connect the electrical supply to the dryer and verify that the Power On indicator is illuminated.
3.
Slowly open the isolation valve on the inlet of the dryer. Verify that there are no leaks.
4.
Test the condensate drains of the filters and verify that they are discharging correctly into a suitable collection vessel.
5.
Check that the system pressure relief valve is closed.
6.
When the dryer is pressurised to full system pressure, slowly open the outlet isolation valve.
If a bypass line has been fitted, close the bypass valve.
7.
Verify that the column pressure gauges are cycling between zero and full system pressure every three minutes.
No further intervention is required for normal operation.
4.3 Stopping the equipment
1.
Close the isolation valve on the outlet followed by the isolation valve on the inlet.
If a by-pass line has been fitted, simultaneously open the by-pass valve.
2.
De-pressurise the dryer by venting through the drain ball valve on the outlet dust filter.
Note:
The drain valve should be opened gradually.
3.
Disconnect the electrical supply to the dryer.
The facia of the dryer consists of indicators only as follows:
1
Power “ON” Indicator
2
Service Required Indicator
3
Cartridge Wear Indicator
4
Correct operation
Start-up should be undertaken by an Parker domnick hunter trained, qualified and approved service engineer.
1
2
3
4
Warning
Содержание DAS 1
Страница 94: ...EL 101 2 2 Parker domnick hunter 2 3 3 2 1 IEC 1 1 1 5 2 6 3 7 4 8 _...
Страница 96: ...EL 103 3 4 3 5 7 bar 7 bar g 102 psig 7 bar X 1 2 C Y CSA NPT X 230V T500mA 115V T1A Brown Blue 1 2...
Страница 97: ...EL 104 4 4 1 4 2 1 _ 2 3 _ 4 5 _ 6 7 _ 4 3 1 2 3 1 2 3 4 Parker domnick hunter 1 2 3 4 Warning...
Страница 98: ...EL 105 5 5 2 Parker domnick hunter 5 1 5 2 6 24 3 6 12 36 _Q _ X E...
Страница 187: ...Munkav delmi el r sok HU 201...
Страница 214: ...RU 231 Parker domnick hunter 2 3 A3 A 1 IEC 1 1 1 5 2 6 3 7 4 8...
Страница 215: ...RU 232 3 3 1 A4 A 3 2 3 3 AO 4 Parker domnick hunter 1 5 AO 2 6 AA 3 7 4 DASMB1 608204061 DASMB2 608204062 Warning...
Страница 216: ...RU 233 3 4 3 5 7 7 102 7 A B 1 2 C CSA NPT A B C 230V T500mA 115V T1A Brown Blue 1 2...
Страница 217: ...RU 234 4 4 1 4 2 1 2 3 4 5 6 7 4 3 1 2 3 1 ON 2 3 4 Parker domnick hunter 1 2 3 4 Warning...
Страница 218: ...RU 235 5 5 2 Parker domnick hunter 5 1 5 2 6 24 3 6 12 36 POWER ON STATUS FAULT A B D E...
Страница 255: ...Tag rif dwar is Sigurt MT 275 A2 A3 Red Yellow Green Yellow 1 6 7 6 8 4 5 2 1 3...
Страница 256: ...Tag rif dwar is Sigurt MT 276 A4 3 4 2 1 5 4 4 7 6...
Страница 257: ...Tag rif dwar is Sigurt MT 277 A5 E E E D E A...