background image

 

 

 
 

 

 
 
 
 
 

 

 

 

CONTROLS - ELECTRICAL 

 
 
 
 
CURRENT CONTROL/RED PILOT LIGHT 

This is the main switch, located next to the ammeter on the front panel. With the current 
control in any position other than "Off", the red pilot light will glow indicating that the unit is 
ready for operation. Current values will be indicated by the 
ammeter reading when the external magnetizing circuit (loop) is complete. 
 

OVERLOAD CIRCUITBREAKER 

This control is located within the unit and is an automatic resetting type circuitbreaker. It will 
interrupt the current to the transformer whenever the rated duty cycle is exceeded. 
 

AMMETER 

The ammeter, located on the front  panel, registers the current flowing in the magnetizing 
circuits. An automatic solid state switching circuit allows a single meter to provide accurate 
current readings for both AC and half-wave DC magnetizing currents. 
 

OUTPUT TERMINALS 

Half-wave DC current is obtained by connecting the magnetizing cables to the "Common" 
and "Half-Wave" connectors. AC current is obtained by connecting to the "Common" and 
"A.C." connectors. Always insert and then twist cable connectors clockwise to lock in 
position. 
 

CONTROL CABLE RECEPTACLE  

This receptacle is located below the current control. Twist and lock the control cable in the 
receptacle. 
 

PROD CONTROL SWITCH 

Various optional prod assemblies have a control switch built into the handle. It is connected 
through a 20' cable and three prong twist lock plug to the control cable receptacle. It controls 
the magnetizing current through the prods. 
 

REMOTE CONTROL CABLE SWITCH 

The optional remote control switch (P/N MA7RC) is attached trough a 20' cable and activates 
the unit with a push button switch. This switch is required when using cables as a coil. 
 
  
  

 

 
 
 
 

www.

GlobalTestSupply

.com

Find Quality Products Online at:

[email protected]

Содержание DA750-115

Страница 1: ...ng and demagnetizing current THE FOLLOWING SHOULD BE READ AND FULLY UNDERSTOOD SAFETY PRECAUTIONS PAGE 2 GENERAL DESCRIPTION PAGE 2 ELECTRICAL FEATURES PAGE 3 CONNECTION PAGE 3 CONTROLS ELECTRICAL PAGE 4 OPERATION PAGE 5 SERVICE DATA WARRANTY PAGE 6 SCHEMATIC DIAGRAM PAGE 7 8 Parker Research Corporation assumes no liability from any claims arising from the use of this equipment CAUTION For the cor...

Страница 2: ...an be harmful to people with implanted Cardiac Pacemakers Personnel with such devices should not operate this machine and must stay a safe distance away from this machine and cable output area Contact the manufacturer of your Pacemaker for additional precautions and warnings GENERAL DESCRIPTION The DA750 is a extremely rugged and compact Magnetic Inspection unit All operating controls and output t...

Страница 3: ... cause excessive line current draw and possible overheating of parts CONNECTION 1 With current control in the Off position connect the line cord to the properly fused and grounded disconnect switch of proper rating Consult Data Nameplate on the back of the unit for correct operating voltage 2 Turn the current control so that the unit powers On A red pilot light will glow indicating that there is p...

Страница 4: ...r both AC and half wave DC magnetizing currents OUTPUT TERMINALS Half wave DC current is obtained by connecting the magnetizing cables to the Common and Half Wave connectors AC current is obtained by connecting to the Common and A C connectors Always insert and then twist cable connectors clockwise to lock in position CONTROL CABLE RECEPTACLE This receptacle is located below the current control Tw...

Страница 5: ...rrent control to position that gives desired current level 4 Make prod contacts with clean surface of part Place prod tips approximately six inches apart on either side of the line of suspected defect Press prod handle switch to initiate current flow Use very firm contact pressure to minimize chances of arcing and burning Ammeter will indicate magnetizing current 5 Apply magnetic powder to the sur...

Страница 6: ...ght charges for a period of one 1 year from the date of purchase Warranty will not apply to units that have been altered or to those units that have been used improperly In the event of malfunction return the unit prepaid to the factory Repair or replacement of the defective unit will be made at the discretion of Parker Research Corporation The repaired or replacement unit will be returned to the ...

Страница 7: ...7 www GlobalTestSupply com Find Quality Products Online at sales GlobalTestSupply com ...

Страница 8: ...8 www GlobalTestSupply com Find Quality Products Online at sales GlobalTestSupply com ...

Отзывы: