manualshive.com logo in svg
background image

 1 

Super

 

Roof

 

without

 

Sprout

 

SKU: 

175

622pg

 

Содержание 622pg175

Страница 1: ...1 Super Roof without Sprout SKU 175 622pg...

Страница 2: ...g structure with a slide exit oriented toward your new one add a minimum safety zone to that of the existing slide to determine how far away you need to be Never install playground equipment near arou...

Страница 3: ...d All protruding nuts and bolts should be eliminated sharp edges on pipes should be capped or removed Check for bent broken or severely worn pipe and replace Examine play system for foreign objects ho...

Страница 4: ...or plastic materials maintaining the proper depth of surfacing material and cleaning up debris The following are some regular maintenance areas of note Check for and repair damage caused by wear or va...

Страница 5: ...ions should be solid and adequately secured Check all posts in ground for corrosion below grade When flexible components are anchored in the ground check and make sure anchoring devices are below the...

Страница 6: ...Manufacture recommends the following maintenance procedures be followed...

Страница 7: ......

Страница 8: ...and installation for a period of 10 years from the date of shipment to the original customer FIVE YEAR LIMITED WARRANTY ON ROTOMOLDED AND BLOWMOLDED PLASTIC COMPONENTS Manufacture provides a limited w...

Страница 9: ...anty is applicable to the original owner only Warranties are non transferable Claim Procedure To make a warranty claim send your written statement of claim photographs of defective equipment and the o...

Страница 10: ...idelines Unacceptable materials for use zones of play structures with fall heights of 18 in or less shall include all hard or abrasive materials such as asphalt concrete terrazzo or other materials wi...

Страница 11: ...l equipment Do not install play equipment near any bodies of water If adjacent to a street with traffic ensure adequate fencing acts as a barrier to children running into danger 4 Site layout should i...

Страница 12: ...TOOLS REQUIRED 14...

Страница 13: ...1 70mm 2 3 4 33 11 0008 60mm 2 3 8 33 11 0007 50mm 2 33 11 0010 40mm 1 9 16 33 11 0006 35mm 1 3 8 33 11 0005 30mm 1 3 16 33 11 0004 25mm 1 33 11 0003 20mm 3 4 33 11 0002 13mm 1 2 33 11 0001 M10 B H C...

Страница 14: ...to eliminate conflicting traffic patterns As a general rule allow at least 3 of freespace around the entire structure IMPORTANT Never install play equipment over hard unresilient surfaces such as asph...

Страница 15: ...l to cushion accidental falls Placement for 12 Diameter x 12 Deep Holes for In ground installation 1 Review Use Zone Mark the placement of one Deck Post Any of the 4 may be used NOTE Survey flags may...

Страница 16: ...CHOR 7 33 11 0402 8 M10 T NUT 8 IMPORTANT Never install play equipment over hard unresilient surfaces such as asphalt concrete or compacted earth It is the owner s responsibility to ensure the minimum...

Страница 17: ...Footbuck Ass y and Footer Plate as template mark hole position on concrete Remove Footbuck Ass y and Footer Plates and drill 3 8 Dia x 2 deep holes into concrete to receive anchor 5 Attach Footbuck As...

Страница 18: ...2 M10 LOCK NUT 6 33 11 0402 8 M10 T NUT 7 IMPORTANT Never install play equipment over hard unresilient surfaces such as asphalt concrete or compacted earth It is the owner s responsibility to ensure...

Страница 19: ...nd Bracket in position secure each Footbuck Ass y and Platform Onground Bracket to the ground using Ground Spikes NOTE A 4lb hammer may be required to drive spikes into the ground Install ground spike...

Страница 20: ...silient surfaces such as asphalt concrete or compacted earth It is the owner s responsibility to ensure the minimum area required contains an appropriate amount of resilient material to cushion accide...

Страница 21: ...ttach Platform Mounting Bracket to Footbuck using M10 x 35mm B H C S and M10 Lock Nut See Detail 014 3 Continue assembling unit before pouring concrete in Refer to pages 24 to 35 IMPORTANT POURING CON...

Страница 22: ...FORM MOUNTING BRACKET 02 08 0126 1 MOUNTING BAR 02 08 0127 1 RAINWHEEL MOUNTING BRACKET 02 08 0128 1 RAINWHEEL BUSHING 02 08 0129 1 PLASTIC SPACER 02 08 0140 2 HANDHOLD BRACKET 02 08 0141 2 UPRIGHT PO...

Страница 23: ...mpleted Remove Any Unused Parts From The Play Environment And Dispose Save Them In A Secure Location Any bolt end protruding more than two full threads beyond the face of the nut causes risk of clothi...

Страница 24: ...OS 02 08 0025 SHAPES PANEL 02 08 0014 HANDHOLD ODD 02 08 0144 003 004 002 POST CAP 02 08 0027 007 UPPER POST COVER 7 38 LONG 02 08 0033 SPROUT DECK w 10 INSERTS 02 08 0061 CLOCK PANEL 02 08 0011 MOUNT...

Страница 25: ...ts and Upright Posts in correct location according to the top view IMPORTANT Depending on mounting option surface mount in ground or on ground footing plates must be installed at this time Refer to pa...

Страница 26: ...01 2 Slide Platform onto Upright Posts 3 Slide Lower Post Covers onto Lower Posts 001 PLATFORM MOUNTING BRACKET PLATFORM 001 M10 FLATWASHER 33 11 0200 M12 LOCKWASHER 33 11 0203 M10 x 25mm 1 BHCS BOLT...

Страница 27: ...3 6 5 STEP 3 1 Slide Sprout Deck onto Upright Posts IMPORTANT Orientation of drilled holes in deck is critical SPROUT DECK w 10 INSERTS 02 08 0061 UPRIGHT POST 51 7 8 LG 02 08 0141 IMPORTANT ORIENTAT...

Страница 28: ...10 9 6 11 14 8 15 7 12 13 4 3 6 5 STEP 4 1 Slide Handhold Brackets over Upright Posts Align pipe of the Handhold Bracket with the hole in the Deck SPROUT DECK w 10 INSERTS 02 08 0061 UPRIGHT POST 51 7...

Страница 29: ...on to Upright Post and Lower Post Making sure that the pipe on the Handhold Brackets is inserted into the bottom holes of the Handholds correctly IMPORTANT Panels and Handholds must slide over Upright...

Страница 30: ...t the pipe on the Handhold Brackets is inserted into the bottom holes of the Handholds correctly IMPORTANT Panels and Handholds must slide over post simultaneously Warning label needs to face out when...

Страница 31: ...33 DC SUPER SPROUT 2 1 3 4 2 5 1 CM 0 INCH 0 10 9 6 11 14 8 15 7 12 13 4 3 6 5 STEP 7 1 Slide Play Ramp and Upper Post Cover into place PLAY RAMP 02 08 0059 UPPER POST COVER 7 38 LONG 02 08 0033...

Страница 32: ...per Post through the Panels Upper Post Covers and Play Ramp and attach to Lower Post 2 Use T Tool turn clockwise to tighten all Upper Post to Lower Post See Figure 1 UPPER POST COVER 7 38 LONG 02 08 0...

Страница 33: ...il 082 2 Attach Play Ramp to Deck using M10 x 60mm B H C S M12 Lock Washer and M10 Flat Washer See Detail 020 020 DECK SLIDE M10 FLATWASHER 33 11 0200 M12 LOCKWASHER 33 11 0203 M10 x 60mm 2 3 8 BHCS B...

Страница 34: ...rom underside of Bongo attach the Bongo Support Bracket using M8 x 25mm B H C S M10 Lock Washer M8 Flat Washer and M8 Lock Nut See Detail 003 003 BONGO SUPPORT BRACKET 02 08 0103 M8 x 25mm 1 BHCS BOLT...

Страница 35: ...Bongo Support Bracket to Bongo Bracket using M8 x 25mm B H C S and M8 Barrel Nut See Detail 004 6 Drill 1 4 hole through Mounting Bracket and Bongo Support Bracket to install Rivet See Detail 039 039...

Страница 36: ...pply loctite adhesive to threads of stud 4 Attach Rainwheel to Rainwheel Mounting Bracket using Yellow Plastic Cap M8 Lock Nut M8 Flat Washer Rainwheel Bushing and Plastic Spacer See Detail 006 NOTE B...

Страница 37: ...CM 0 INCH 0 10 9 6 11 14 8 15 7 12 13 4 3 6 5 STEP 12 007 PANEL UPRIGHT POST POST CAP 02 08 0027 M10 x 50mm 2 BHCS BOLT 33 11 0010 1 Attach Post Caps to Upright Posts using M10 x 50mm B H C S See Det...

Страница 38: ...ER 33 11 0201 M8 x 40mm 1 9 16 BHCS BOLT 33 11 0106 FOOTER COVER 02 08 0009 M8 BARREL NUT 33 11 0501 FOOTER COVER 02 08 0009 022 022 1 After entire unit is assembled attach Footer Covers to Lower Post...

Отзывы: