Gener
al
Information
Pr
epar
e
Oper
ate
Help
Technology
Systems and technical documentation
138
23.2
Customer service book
›
1. Inspection (12 months after commissioning)
Date:
Signature:
Stamp:
›
2. Inspection (annual)
Date:
Signature:
Stamp:
›
3. Inspection (annual)
Date:
Signature:
Stamp:
›
4. Inspection (annual)
Date:
Signature:
Stamp:
›
5. Inspection (annual)
Date:
Signature:
Stamp:
›
6. Inspection (annual)
Date:
Signature:
Stamp:
›
7. Inspection (annual)
Date:
Signature:
Stamp:
Содержание PR 50
Страница 1: ...User manual PR 50 The Paravan wheelchair series www paravan com EN V3 0 ...
Страница 142: ...Space for your notes ...
Страница 143: ...Space for your notes ...