STEP 10:
Locate the Mesh Guards (10)--8 pieces/4 sets. There will be 4 pieces that
are narrow and 4 pieces that are wider (Fig A). Begin with the wider pieces and hang
them with the hook attached to the mesh guards onto the assembled Aluminum Tubes
(there are oblong 4 holes in each tube—2 at the top and 2 at the bottom – Fig. B).The
wider pieces will go at the bottom and the narrower pieces will go at the top. As you
are hanging the mesh guards, use the Guard Connectors (11) to secure each edge
of the wider guard to the edge of the narrower guard (Fig. C).
STEP 11:
Locate the Guard Fastening Pieces (12). Screw the Guard Fastening Pieces
(12) on the top of the mounting plate to help keep the Mesh Guards firmly in place
using 4 – M3/16 screws (14).
- 8 -
STEP 12:
Locate the Knob with Chain (13) and screw the knob into the front panel of
the Tank Housing Assembly and attach the chain to the control box.
STEP 13:
The heater is now assembled and ready for
leak testing and use.
Содержание PH08-S BK
Страница 9: ......