background image

295 East Corporate Place • Suite 100 • Chandler, AZ 85225

Toll Free: 1.800.621.5886 • Phone: 480.893.7607 • Fax: 480.753.3397

[email protected] • www.1Paramount.com

MDX DEBRIS REMOVAL SYSTEM MANUAL:

FOR THE STATE OF FLORIDA

Notice to Installers:

Read and follow these instructions. Give these instructions to

the facility owner. Follow all codes and regulations that apply to

the design, installation and use of suction outlet fittings.

U.S. Patent No.: 6,810,537, 7,089,607, 7,178,179

ASME/ANSI A112.19.8M—1987 LISTED

MDX0803

004-027-8754-00

2/07

MDX Installation Manual . . . . . . . . . . . . . . . . . . . . . . Page 1
MDX 1-Piece Sump Installation Manual . . . . . . . . Page 8

Содержание MDX

Страница 1: ...TE OF FLORIDA Notice to Installers Read and follow these instructions Give these instructions to the facility owner Follow all codes and regulations that apply to the design installation and use of su...

Страница 2: ...leading cause of Body Suction Entrapment Hazards Note your certified builder has many effective options for addressing this hazard they may include dual drain systems like MDX skimmers gutters negativ...

Страница 3: ...finished depth of the pool spa or basin Fig 1 Position the REQUIRED 2nd Suction Outlet on a sidewall of the pool spa or basin Option the 2nd Suction Outlet may be positioned on the floor a MINIMUM of...

Страница 4: ...ht seal Sealing compound example Topping Mix Cement hydraulic cement and Thoro Acryl 60 by ChemRex or equivalent Assemble the drain PRIOR TO ADDING WATER Install the Funnel Assembly No 3 into the Conc...

Страница 5: ...e stack to both lines at a location away from the MDX Debris Removal System Sump 3 Pressure should remain on the system through construction until interior cleanup 2 HYDROSTATIC PLUG 2 1 2 PLUGS QUANT...

Страница 6: ...Concrete Shell Sump Fig 4 Form a concrete sump around each suction pipe Concrete Shell Preparation Fig 5 Prior to installing the interior finish cut each SDX riser pipe approximately 1 behind the conc...

Страница 7: ...ction pipe 5 Wipe clean any finishing material that remains on the SDX Concrete Ring s top edge and mounting surface Concrete Cover Assembly Fig 7 1 Align the SDX Concrete Support with the alignment t...

Страница 8: ...0 006 252 6174 00 Sump Adaptor Kit Florida R1 N A REQUIRED CONNECTION TO A 2nd Suction Outlet 2 pipe 11 005 202 1154 00 Plaster Cap 12 005 202 1148 00 Sump Construction Cap 13 005 252 1611 00 Plug Pre...

Страница 9: ...NOTES 7...

Страница 10: ...stallers Read and follow these instructions Give these instructions to the facility owner Follow all codes and regulations that apply to the design installation and use of suction outlet fittings U S...

Страница 11: ...eading cause of Body Suction Entrapment Hazards Note your certified builder has many effective options for addressing this hazard they may include dual drain systems like MDX skimmers gutters negative...

Страница 12: ...oss for a given system virtually any modern pump is capable of exceeding this limit therefore it is the responsibility of the system designer to make sure it is not possible to exceed 90 GPM Plumbing...

Страница 13: ...oth finish to interior of pool final finish Fig 2 3 Position the REQUIRED SDX High Flow Safety DrainTM on a sidewall of the pool spa or basin Method the 2nd Suction Outlet may be positioned on the flo...

Страница 14: ...l System Sump 3 Pressure should remain on the system through construction until interior cleanup Notice Release pressure on the system before removing plugs Do not install hydrostatic plug until ready...

Страница 15: ...op Assemble the drain PRIOR TO ADDING WATER See illustration on page 12 for reference 1 Install the Funnel Assembly No 2 into the Sump No 1 by pressing the flexible Funnel Adapter inside the center 2...

Страница 16: ...Concrete Shell Sump Fig 4 Form a concrete sump around each suction pipe Concrete Shell Preparation Fig 5 Prior to installing the interior finish cut each SDX riser pipe approximately 1 behind the con...

Страница 17: ...uction pipe 5 Wipe clean any finishing material that remains on the SDX Concrete Ring s top edge and mounting surface Concrete Cover Assembly Fig 7 1 Align the SDX Concrete Support with the alignment...

Страница 18: ...Required Connection to a 2nd Suction Outlet 2 pipe 10 005 202 1155 00 Plaster Cap 1 Piece 11 005 202 1148 00 Sump Construction Cap 12 005 252 1611 00 Plug Pressure Test 2 w O Ring 4 pcs 13 005 252 08...

Страница 19: ...NOTES 17...

Страница 20: ......

Отзывы: