
of 18
14
10
10
10
5
5
5
6
6A
6
5
5
5
5
5
6
6
6A
6A
5
5
5
16
17
15
6
ATTENTION: The tunnels
of top gable connector (10)
are marked, in order to avoid
mistakes when inserting the
roof
gable profiles.
5.E
5.D
6A
Using at least two people,slide the other two roof gable profiles(5,6-5,6A) into tunnels of top gable
connector (10) until the small protrusion on their undersides snap into the holes on the underside of
top gable connector (10).
Connect the two roof gable profiles(5,6) to
roof connectors (12) on opposite corner
profiles(1).Fasten with bolts (17,15) as
shown.