Questions? Problems?
Call
701-775-0551
1-800-448-0822
positioning of the cabinets.
•
Center the Cabinetizer
TM
under the load, making sure
the weight of the load is balanced on the lift.
•
Operate the winch to raise cabinets into place.
•
Level cabinets and fasten in place.
INSTALLING UPPER CABINETS
(before base cabinets)
INSTALLING UPPER CABINETS
(over existing base cabinets)
Using the Dolly Base
Configuration to install
upper cabinets first
(before base cabinets are
in place).
1. Load cabinets onto lift.
2. Operate the winch to raise cabinets
into place. Lock the brakes on the casters
and level the cabinets and fasten in place.
The Dolly Base can be used independantly
to move Cabinets
Using the Counter Base Configuration to install upper
cabinets second (when base cabinets are in place).
1. Start by using the Dolly Base Assembly to raise the
upper cabinets to block (approx. 9” high, blocks not
included) on the base counters.
8
2. Use the Counter Base Configuration for final
Содержание CABINETIZER 72
Страница 6: ...72 05 72 09 72 08 72 07 72 16 72 17 72 18 72 19 Replacement Parts 3...
Страница 7: ...72 15 72 14 72 12 72 11 72 13 Replacement Parts Cont 4...
Страница 15: ......