3. Cabling
8610-A2-GN20-10
April 2001
3-3
Connecting Ethernet Connections to the IPC or Ethernet Hubs
Use this procedure for connecting MVL, ReachDSL/MVL, RADSL, IDSL, and
Packet SDSL cards to the IPC or Ethernet hubs. For other types of cards, refer to
the appropriate Installation Instructions.
Procedure
To connect the DSL cards to the Ethernet hubs or switches:
1. Plug the end of an 8-pin modular cable into the appropriate 10/100 BASE T
port of the 8610 chassis. For example, if you want to connect to a DSL card in
Slot 2, insert the 8-pin modular cable into the 10/100 BASE T Slot #2.
2. Run the 8-pin modular cable under the 8610 chassis and behind the left leg.
3. Plug the other end of the cable into your Ethernet hub or switch connector.
Connecting to an SNMP Management System
Procedure
To connect the Hotwire 8610 DSLAM base chassis (i.e., the chassis that contains
the MCP card) to an SNMP management system:
1. Plug the end of an 8-pin modular cable into the MCP/1 port of the 8610 base
chassis.
2. Dress the 8-pin cable under the 8610 chassis to the left and behind the left
support foot.
3. Plug the other end of the cable into the 10/100 BaseT hub connector to the
SNMP management system network.
00-16323-01
To Hub Connector
10/100 BASE T
2
IN
OUT
SERIAL
ALM INTF MCP/1
MANAGEMENT
3
STACK
POSITION
2
3
6
5
4
1
00-16324-01
To SNMP
Management System
10/100 BASE T
2
IN
OUT
SERIAL
ALM INTF
MCP/1
MANAGEMENT
3
STACK
POSITION
2
3
6
5
4
1
Содержание HOTWIRE 8610 DSLAM
Страница 1: ...Hotwire 8610 DSLAM Installation Guide Document No 8610 A2 GN20 10 April 2001...
Страница 6: ...E April 2001 8610 A2 GN20 10...
Страница 12: ...About This Guide vi April 2001 8610 A2 GN20 10...
Страница 34: ...2 Installation 2 18 April 2001 8610 A2 GN20 10...
Страница 44: ...4 Troubleshooting 4 4 April 2001 8610 A2 GN20 10...
Страница 54: ...Glossary GL 4 April 2001 8610 A2 GN20 10...