background image

 2

COM port-to-PC cable – DB9 connector (14 feet – 4.3 m)

Ferrite choke

FrameSaver SLV 9820 Quick Reference (Document No. 9820-A2-GL10)

Additional cables may be ordered. See

 Cables You Can Order on page 3 when

ordering cables.

Be sure to register your warranty at www.paradyne.com/warranty.

Before You Begin

If you ordered a wall mounting kit (Feature No. 9001-F1-891) for your FrameSaver unit,
install the wall mounting before you start installing the unit. Follow the same guidelines
below when installing the wall mounting. Contact your sales representative to order this
feature.

Before starting the installation, make sure you have:

A dedicated, grounded power outlet that is protected by a circuit breaker within
6 feet of the FrameSaver unit.

A clean, well-lit, and ventilated site that is free from environmental extremes.

One to two feet of clearance for cable connections.

A physical connection to the frame relay network via an NTU, with either an
EIA-530, V.35 or an X.21 user interface. This connection is made using the
appropriate cable attached to the Network port of the FrameSaver unit.

This cable is not supplied with your FrameSaver unit, and you will need to order
the appropriate cable kit for your application, V.35, X.21, or EIA-530 (see page 3
for the Feature No. you need to order).

An async (asynchronous) terminal or PC (personal computer) to set up the
access unit.

Node IP Addresses and Subnet Masks (see your network administrator).

See the User’s Guide for additional information on:

Troubleshooting

Technical Specifications

Cables, Connectors, and Pin Assignments

Содержание FrameSaver SLV 9820-C

Страница 1: ...uals FrameSaver Frame Relay Devices Select the following document 9820 A2 GB20 FrameSaver SLV 9820 User s Guide To request a paper copy of a Paradyne document Within the U S A call 1 800 PARADYNE 1 80...

Страница 2: ...circuit breaker within 6 feet of the FrameSaver unit A clean well lit and ventilated site that is free from environmental extremes One to two feet of clearance for cable connections A physical connect...

Страница 3: ...s X 21 DTE adapter cable EIA 530A to X 21 1 foot 3 meters 9008 F1 521 035 0384 1031 035 0302 0131 Equipment with V 35 interfaces MS34 connectors V 35 cable kit which includes a V 35 network cable 10 f...

Страница 4: ...Make sure the locking tab snaps securely into the jack 98 16197 Power Cord Transformer FrameSaver 9820 Shown O K A L M Locking Tab Grounded Power Outlet 2 Insert the socket end of the power cord into...

Страница 5: ...s COM port 99 16198 01 To Connect to a PC or Async Terminal COM Port FrameSaver 9820 Shown 3 Insert the other end of the cable into the PC or VT100 compatible terminal 4 Tighten the screws on each sid...

Страница 6: ...editing 1 From the Main Menu press the down arrow key twice so the cursor is on Configuration 2 Press Enter to display the Configuration menu The Load Configuration From menu appears 3 Press Enter to...

Страница 7: ...e central site and the remote sites Frame Relay Router Central Site FrameSaver Unit NMS Munich Headquarters Port NET NTU NTU NTU NET Port Frame Relay Router Remote Site FrameSaver Unit London Office D...

Страница 8: ...ting the power cord The unit will perform the self test again If the failure reappears call your service representative for assistance Setting the System Clock To set up the system clock 1 Select Syst...

Страница 9: ...guration options To configure the physical interfaces 1 Select the Network physical configuration options Main Menu Configuration Network Physical 2 Select the appropriate Port Type 3 Press Ctrl a and...

Страница 10: ...these features Main Menu Auto Configuration The default discovery mode is 1MPort In this mode for each DLCI discovered on the network a multiplexed network DLCI and a standard data port DLCI will be...

Страница 11: ...etwork interface is set up correctly and it is operational If not make sure both ends of the network cable are properly seated and secured 4 Verify that the network physical options are configured cor...

Страница 12: ...ect DLCI Records on the network interface Configuration Network DLCI Records 2 Select Modify The Modify DLCI Record for DLCI Number prompt appears 3 Select the DLCI that will be used by pressing the s...

Страница 13: ...t the entire path from the remote unit to the NMS is functioning To run the IP Ping test NMS trap managers must have been configured for the remote unit One of those trap managers must be the central...

Страница 14: ...ck Is the Port OK LED on If yes the port is set up correctly and is operational If no check that both ends of the cable are properly seated and secured Check Health and Status messages in the left col...

Страница 15: ...ext check the DLCI s status Check PVC Connections Check PVC connections to verify that all PVCs including management PVCs are configured and to see whether the PVC is active or not 1 Return to the Sta...

Страница 16: ...16 FrameSaver 9820 Rear Panel 98 16189 FrameSaver 9820 Front Panel 98 16201 O K O K A L M T S T O K 9820 PORT FrameSaverTM SLV FrameSaverTM SLV NETWORK...

Страница 17: ...lable certified for use in the country of installation Paradyne power supply part number 327 0107 0031 is recommended This power supply includes a special mating connector for connection to this equip...

Страница 18: ...the FCC rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can r...

Страница 19: ...by Directive 93 68 EEC Directive 91 263 EEC Council Directive of 29 April 1991 on the approximation of the laws of the member states concerning telecommunication terminal equipment including mutual r...

Страница 20: ...rent information by fax or to speak with a company representative Within the U S A call 1 800 870 2221 Outside the U S A call 1 727 530 2340 Document Feedback We welcome your comments and suggestions...

Отзывы: