background image

 10

Connecting to the Network

Now that the FrameSaver unit is set up, the unit can be connected to the network.

Procedure

1. Use the supplied 6-pin cable for the DSL connection. Insert one end of the cable

into the DSL network interface.

2. Insert the other end of the cable into the modular jack labeled NET.

DSL

Network

00-16685-01

ETHERNET

P
O
R
T

COM

POWER

NET

3. Verify that the Network signal (DSL) LED is green. If so, the network interface is

set up correctly and is operational. If not, make sure both ends of the network
cable are properly seated.

4. Check Health and Status messages in the left column of the System and Test

Status screen.

Main Menu

Status

System and Test Status

Содержание FrameSaver DSL 9783 CSU/DSU

Страница 1: ...Reference To order a paper copy of a Paradyne document Within the U S A call 1 800 PARADYNE 1 800 727 2396 Outside the U S A call 1 727 530 8623 Upgrading a Basic Unit to SLV Full SLV capability can b...

Страница 2: ...ccess cable with 6 pin connector FrameSaver DSL 9783 Quick Reference Document No 9783 A2 GL10 Be sure to register your warranty at www paradyne com warranty Before You Install the FrameSaver DSL Unit...

Страница 3: ...32 straight through cable 8 pin modular to DB25 14 feet 4 3 meters 3100 F2 540 035 0314 1431 PC with a D Sub9 interface connector Standard EIA 232 straight through cable D Sub9 to DB25 14 feet 4 3 met...

Страница 4: ...supply into the grounded power outlet and check the LEDs If any LEDs light you have power If not refer to Troubleshooting in the User s Guide for possible explanations 3 Insert the self mounting tie...

Страница 5: ...top bit set to 1 Flow Control set to None 2 Insert the DB25 end of the EIA 232 cable into the FrameSaver unit s COM port COM Port 00 16685 01 ETHERNET P O R T COM POWER NET VT100 Terminal or PC 3 Inse...

Страница 6: ...o see a visual representation of the menu levels see Menu Hierarchy in the Quick Reference Tab key or Up Down Left and Right Arrow keys Move the cursor from one menu item to the next Enter or Return k...

Страница 7: ...DSL Installation An Easy Install screen is provided for custom configurations but is not required for normal installation Procedure To use the Easy Install screen 1 Select the Easy Install feature Ma...

Страница 8: ...way Address the IP Address that will be used for packets without a route Press the ESC key to return to the Easy Install screen 5 The Network 1 FRF 8 Encapsulation Mode default setting is Translation...

Страница 9: ...is functioning see Verifying the End to End Path on page 13 6 Verify that data is being received see Checking That Data is Being Received on page 15 7 Using the OpenLane VC Provisioning Application or...

Страница 10: ...sert the other end of the cable into the modular jack labeled NET DSL Network 00 16685 01 ETHERNET P O R T COM POWER NET 3 Verify that the Network signal DSL LED is green If so the network interface i...

Страница 11: ...LAN where the NMS resides 00 16687 01 NMS LAN ETHERNET P O R T COM POWER NET 3 Check Health and Status messages in the left column of the System and Test Status screen to verify that there are no Eth...

Страница 12: ...rectly and it is operational If not make sure both ends of the cable are properly seated and secured 5 Check Health and Status messages in the left column of the System and Test Status screen for mess...

Страница 13: ...ill be sent Specify the Initial Route Destination for the Trap Manager s Select desired trap categories 3 Save the configuration 4 Return to the Main Menu Verifying the End to End DSL Provider Managem...

Страница 14: ...number for the uplink VP to be used by these custom connections must be specified on the Max VCI per VPI screen and the apply changes executed For ATM line cards custom connections can be used to exp...

Страница 15: ...ections to verify that all PVCs including management PVCs are configured and to see whether the PVC is active or not Procedure 1 From the FrameSaver DSL 9783 Main Menu select PVC Connection Status The...

Страница 16: ...in which it is installed If necessary consult with the appropriate regulatory agencies and inspection authorities to ensure compliance 7 A rare phenomenon can create a voltage potential between the e...

Страница 17: ...be coordinated by a representative designated by the supplier Any repairs or alterations made by the user to this equipment or equipment malfunctions may give the telecommunications company cause to...

Страница 18: ...ommunications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense The autho...

Страница 19: ...ll 1 727 530 2340 Document Feedback We welcome your comments and suggestions about this document Please mail them to Technical Publications Paradyne Corporation 8545 126th Ave N Largo FL 33773 or send...

Отзывы: