4
Powering Up the ENE2020
Plug the power supply into the power adapter port on the back of the ENE2020 and
connect it to your power source.
Verify that the Power LED on the front of the ENE2020 is illuminated.
NOTE: Upon start up, the Ethernet link will remain disabled (as indicated by no
illumination of the Ethernet 100, Act and Lnk LEDs) until at least one of the two E1
connections has been established.
10/100 Connection
Port 1
Port 1 Config
04-17581
Power
Adapter
5V DC
Port 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Port 2 Config
T1 or E1
04-17580
Port 2
E1 Connection
Power
Lnk
100
Act
Lnk
10/100 Ethernet Connection
E1 Network Extender 2000
ENE2020
Port 1
Alm
Содержание ENE2020-P
Страница 15: ...15 ...
Страница 16: ...16 ENE2 A2 GN10 10 ENE2 A2 GN10 10 ...