
5. Advanced Setup
5-2
August 2005
6211-A2-GB21-30
Add Function – ATM PVC Configuration
If you want to add a new rule for the WAN interface, click on the Add button. The
ATM PVC Configuration screen appears. The ATM PVC Configuration screen
allows you to configure an ATM PVC identifier (VPI and VCI) and select a service
category.
Figure 5-2.
ATM PVC Configuration Screen
Verify the following values with your ISP before you change them.
VPI (Virtual Path Identifier) – The valid range is 0 to 255.
VCI (Virtual Channel Identifier) – The valid range is 32 to 65535.
Service Category – Five classes of traffic defined are defined:
— UBR Without PCR
— UBR With PCR
— CBR
— Non-Realtime VBR
— Realtime VBR
Содержание 6211-I1
Страница 1: ...6211 I1 Router User s Guide Document No 6211 A2 GB21 30 August 2005 ...
Страница 6: ...E August 2005 6211 A2 GB21 30 ...
Страница 10: ...Contents iv August 2005 6211 A2 GB21 30 ...
Страница 29: ...2 Hardware Installation and PC Setup 6211 A2 GB21 30 August 2005 2 13 Figure 2 11 Web Interface Home Page ...
Страница 30: ...2 Hardware Installation and PC Setup 2 14 August 2005 6211 A2 GB21 30 ...
Страница 40: ...3 Device Information 3 10 August 2005 6211 A2 GB21 30 ...
Страница 44: ...4 Quick Setup 4 4 August 2005 6211 A2 GB21 30 ...
Страница 76: ...5 Advanced Setup 5 32 August 2005 6211 A2 GB21 30 ...
Страница 78: ...6 Diagnostics 6 2 August 2005 6211 A2 GB21 30 ...
Страница 95: ...7 Management 6211 A2 GB21 30 August 2005 7 17 ...
Страница 96: ...7 Management 7 18 August 2005 6211 A2 GB21 30 ...
Страница 98: ...A Specifications A 2 August 2005 6211 A2 GB21 30 ...
Страница 102: ...Index IN 4 August 2005 6211 A2 GB21 30 ...