
12
FIGURE 8
STEP 8:
0
1
2
3
4
5
6
1/2
1/2
1/2
1/2
1/2
1/2
• Place one 4-1/2” PULLEY (15) into the loop of the CABLE (12) below the second and third PULLEY of the TOP BOOM (4) as
shown in FIGURE 8.
•
SECURELY
assemble two 1/4 x 2 x 7-1/4”” PLATES (9) to each side of the 4-1/2” PULLEY (15) using one 3/8 X 2-1/4”
BOLT (29), two 3/8” WASHERS (25), and one 3/8” LOCK NUT (26). See FIGURE 8.
29 3/8 X 2-1/4”
4
5
37
9
15
27
26
• Attach the CABLE (12) from the TOP BOOM (4) to the CARRIAGE (5) using one QUICK LINK (37) as shown in FIGURE 8.
(IMPORTANT! Securely tighten QUICK LINK.)
!IMPORTANT!
SECURELY
TIGHTEN