13
FIGURE 13
FIGURE 14
STEP 14
• Snap two WEIGHT PLATE BUSHINGS (96) each,
into the “ top” side of fifteen WEIGHT PLATES
(74) as shown in FIGURE 14.
STEP 13
•
Loosely
assemble four 3-1/2” PULLEYS (79) to the slots in TOP BOOM (7) using four 3/8 X 2-3/4” BOLTS (38), eight 3/8”
FLANGE SPACERS (66), and four 3/8” LOCKNUTS (48) as shown in FIGURE 13.
(NOTE: Make sure the cable is routed
under all the pulleys.)
• All FLANGE SPACERS & LOCKNUTS
are 3/8” FLANGE SPACERS (66) & 3/8”
LOCKNUTS (48).
74
48
79
7
38 3/8 X 2-3/4”
66
92
• Route the threaded end of LAT CABLE (92) through the TOP BOOM (7) as shown in FIGURE 13.
96
• Slide the WEIGHT PLATE SHAFT (80) thru the
hole in the HEAD PLATE(81), and lock in place
using one E-RING (46) as shown in FIGURE 14.
81
46