background image

17

Console Module

YELLO

W

GREY

D

ARK GREEN

PURPLE

ORANGE

LIGHT BLUE

GREEN

PINK

BR

O

WN

BLUE

6

x3

Connect frames

2

Fold out feet

Snap finishing rods into place

Insert platform

Attach platform

x1

x2

Disconnect frames

1

2

Shipping

position

Содержание h-line

Страница 1: ...Assembly instructions MKG_US_setuphlineUSACA_V1_20140926 Also includes ...

Страница 2: ...Thank you for choosing ...

Страница 3: ...GREEN N PINK N BROWN N BLUE N Identification of the crate 4 Assembly don ts 5 Smart optimized storage 6 Color coding of modules 7 Assembly sequence Example 8 How to connect frames 9 Standard Module 10 Corner Module 10 Storage Module 10 sqft and Closet 11 Storage Module 20 sqft 12 Shelving Module 13 Multimedia Module 14 Arch Module 15 16 Console Module 17 High Sign Boards 18 19 Aisle Sign 20 Counte...

Страница 4: ...g rod Shelf support Hanging rod Stepladder Extension cord TV iPad Power strip Trash bin Shelf Counter platform Console platform Counter shelf Shelf Connection tube ACCESSORIES CONNECTOR STORAGE FURNISHINGS LED display light 3 Pull out 1 Remove START box x4 2 Unscrew ...

Страница 5: ...5 1 3 4 5 2 1 2 Assembly don ts 3 1 Do not disassemble the frame or remove the graphic Do not place the frame on the ground graphic side down Do not carry horizontal ...

Страница 6: ... THE FRAMES Some frames are connected during shipping Corner profile Storage Counter Module High Signboarding Module Console Module Standard module 19 Standard module 38 To disconnect the frames refer to the corresponding modules see contents 19 19 38 9 1 2 ...

Страница 7: ...7 Color coding of modules BROWN N ...

Страница 8: ...8 1 2 3 4 5 6 11 19 12 20 21 22 15 14 26 8 9 23 24 25 13 17 18 16 7 10 Assembly sequence Example 23 Start here Refer to the rendering created especially for your booth for frame numbering ...

Страница 9: ...9 How to connect frames MODULAR SOLUTION 3 1 2 Insert Rotate Lock in place 90 Open completely Connector ...

Страница 10: ...10 Corner Module YELLOW N GREY N DARK GREEN N PURPLE N ORANGE N N LIGHT BLUE GREEN N PINK N BROWN N BLUE N x2 x2 Corner profile 1 Identify components 2 Attach the corner profile 3 Connect x1 ...

Страница 11: ... N DARK GREEN N PURPLE N ORANGE N N LIGHT BLUE GREEN N PINK N BROWN N BLUE N x1 x4 x4 1 Connect frames 2 Attach door 3 Snap finishing rods into place x2 Always transport with the door locked See storage accessories p 24 Black graphics inside ...

Страница 12: ...onnect frames 2 Attach door 3 Snap finishing rods into place x1 YELLOW N DARK GREEN N PURPLE N ORANGE N N LIGHT BLUE GREEN N PINK N BROWN N BLUE N Always transport with the door locked See storage accessories p 24 Black graphics inside ...

Страница 13: ...13 Shelving Module DARK GREEN N PURPLE N ORANGE N N LIGHT BLUE GREEN N PINK N BROWN N BLUE N Wood Plexiglas 1 Fold out feet 2 Insert shelf fasteners 3 Install shelves x1 1 2 ...

Страница 14: ...N PURPLE N ORANGE N N LIGHT BLUE GREEN N BROWN N BLUE N Anti theft device Padlock placement Right view Left view 1 Fold out feet 2 Attach TV 3 Insert anti theft device x1 Install TV stand before three step if it has not been provided ...

Страница 15: ...15 Arch Module 1 2 DARK GREEN N PURPLE N ORANGE N N LIGHT BLUE BROWN N BLUE N 2 m 1 Fold out feet 2 Place frame 2 m away 3 Place canopy on top x2 ...

Страница 16: ...16 DARK GREEN N PURPLE N ORANGE N N LIGHT BLUE BROWN N BLUE N Arch Module 2 2 Connects in front of canopy Connects in back of canopy 4 Connect 5 Position arch 6 Snap finishing rods into place x4 ...

Страница 17: ...e Module DARK GREEN N ORANGE N N LIGHT BLUE BROWN N BLUE N 6 x3 3 Connect frames 2 Fold out feet 4 Snap finishing rods into place 5 Insert platform Attach platform x1 x2 1 Disconnect frames 1 2 Shipping position ...

Страница 18: ...18 High Sign Boards 1 2 ORANGE N N LIGHT BLUE BROWN N BLUE N 1 Disconnect frames 2 Insert connecting tubes 3 Attach sign frames 4 Add remaining frames Shipping position x1 x6 ...

Страница 19: ...19 High Sign Boards 2 2 ORANGE N N LIGHT BLUE BROWN N BLUE N 5 Lock in place 6 Position sign 7 Lock in place 8 Snap finishing rods into place x4 x4 x4 ...

Страница 20: ...20 Aisle Sign ORANGE N BROWN N BLUE N Slits for graphic No corner profile Two sided graphic Right version Left version Finishing rods see p 23 1 Connect 2 Snap finishing rods into place x1 x2 ...

Страница 21: ...21 Counter Module BROWN N BLUE N x4 Shipping position 1 Disconnect 2 Connect at an angle 3 Position shelf 4 Snap finishing rod into place 5 Position platform on top x1 x4 x2 x1 x1 No corner profile ...

Страница 22: ...Module Door BROWN N BLUE N x1 x1 Door 1 Disconnect 2 Connect at an angle 5 Snap finishing rod into place 4 Attach door x1 x4 x4 x4 x2 Shipping position No corner profile 3 Position shelf 6 Position platform on top ...

Страница 23: ...23 Finishes FEET Closed position of feet during shipping Open and locked position Free standing position FINISHING RODS Snap into place Snaps into place Snaps into place ...

Страница 24: ...ELVES Finishes Locate slits on the graphic 1 2 Maximum load 6 61 lbs HANGING ROD High sign board position Hangers included 1 Identify Set in place 1 Install hanging rod 2 Place hangers inside 3 Attach shelf ...

Страница 25: ...25 FREE STANDING SHELF Finishes x4 x4 x12 x4 LED DISPLAY LIGHT Assemble 1 2 3 ...

Страница 26: ...Require the original This will guarantee that you are in compliance with the fireproofing standards of your country ...

Отзывы: