
BA_PH_116-10_EN_12-22.docx
27
10
Mounting and Preparation
Mounting work may only be carried out by trained specialist personnel.
Before the machine can be put into operation, the components supplied must be assembled. The procedure is
described in detail in the following sections.
10.1
Removing the Transport Lock
Figure 8: Remove transport lock
During transport, the movable drilling support is secured to
the table top with a transport lock.
•
If not already done during unpacking (see section
the transport lock (
T
) must be removed with an open-
end spanner before starting the mounting work de-
scribed below.
Keep the transport lock and associated parts
in a safe place in case the machine needs to
be transported at a later date.
10.2
Mounting the Dowel Drilling Unit
Figure 9: Mounting the dowel drilling unit
The dowel drilling unit is supplied completely pre-assem-
bled. It only needs to be mounted on the drilling table with
two screws.
•
Pull the locking bolt (
24
) and turn it by 90°.
•
Unscrew the two screws (
S
) mounted in the table.
•
Place the dowel drilling unit (
22
) on the holes and fas-
ten it with the screws (
S
).
10.3
Mounting the Workpiece Stop
Figure 10: Mounting the workpiece stop
The supplied workpiece stop (
4
) can be attached to both
sides of the drilling table (
2
).
•
Open clamping lever (
6
).
•
Insert the extension rod (
5
) into the hole on the side of
the table top and tighten the clamping lever (
6
) again.
•
Push the clamping unit (
K
) onto the extension rod (
5
)
and clamp it together with the stop rod (
4
) by means
of the lever.
T
24
S
K
4
5
6