9910045 RevF
October
2020
PAGE
26
Appendix F: Rail Configurations
In cases where a contiguous array has module omissions
additional Rails must be installed as shown.
Module omitted
Roof obstruction
Rails are installed across the
edge to connect row
Bolts which are installed into a pre-installed nut
are tightened to
6 ft-lb.
Bolts which are installed into a pilot hole are
tightened to
4 ft-lb.
Module(s) omitted
Roof obstruction
Rails are installed across the
edge to connect row
Torque to 4 ft-lb
Torque to 4 ft-lb