SmartZone Gateway E24 User Manual
-
12
-
Installation Requirements
l
E24 unit.
l
Mains power cables (supplied)
l
10/100 base T network connection.
l
Network connected computer system to setup the E24 .
l
1 x network crossover cable
l
Screwdrivers
Rack – Mounting
This section covers the basic rack-mounting of the E24.
Additional Equipment Required
You need to supply a number-2 Phillips screwdriver to rack-mount the E24.
Before You Begin
When determining where to install the E24, please verify that these guidelines are met:
l
Airflow around the E24 is unrestricted.
l
Clearance to the front and rear panels meet these conditions:
l
Front-panel LEDs can be easily read.
l
Access to ports is sufficient for unrestricted cabling.
l
AC power cords can reach the E24.
l
The 10/100 network cabling does not exceed 100 meters from the E24 to the
Network switch.
l
Temperature around the E24 does not exceed 40 deg.C
l
Humidity around the E24 does not exceed 90 percent.
Installation Warning Statements
This section includes the basic warning statements.
l
Only trained and qualified personnel should be allowed to install, replace, or ser-
vice this equipment.
Содержание SmartZone E24
Страница 1: ...Release 1 0 Issue 2 SmartZone Gateway E24 User Manual ...
Страница 16: ...SmartZone Gateway E24 User Manual 16 3 Select Change adapter settings from the menu on the left ...
Страница 21: ...SmartZone Gateway E24 User Manual 21 4 Click Save to confirm the changes ...
Страница 47: ...SmartZone Gateway E24 User Manual 47 5 Click Save to bring any changes into effect ...