INSTRUCTIONS FS149A

For Technical Support: www.panduit.com/resources/install_maintain.asp

Figure 13

4 RU Cable Manager

6.

Patch Panel

FRONT

Connector Installation

:

a. Install 4RU cable manager to the leg as shown.

(See Figure 13).

Figure 14

Figure 15

b. Route 1st fiber bundle of 72 fibers cable through brushes in

opening as shown. Bring fiber cable up toward patch panel.
Route cables through 1st bottom position in 4RU cable
canager. Secure cables to 4RU manager 1st position with
hook-n-loop. (See Figures 14 through 15).

Figure 16

Figure 17

1st bundle of 72
fiber cables

2nd bundle of
72 fiber cables

3rd bundle of 72
fiber cables

4th bundle of 72
fiber cables

c. Route 2nd fiber bundle of 72 fiber cables through brushes in opening as shown. Bring fiber bundle up towards the patch panel.

Route bundle through 2nd bottom position in 4RU cable manager. Secure bundle to 4RU 2nd position with hook-n-loop.
(See Figures 16 through 17).

Page 7 of 19

Содержание FLEX-ZRFECG

Страница 1: ...Point them towards the center making a cross from the corners See Fig ure 2 2 Ensure that the plate is allowed to pivot from side to side NOTE If Grid Runner is placed above pedestal plate then the m...

Страница 2: ...2 of 19 Installation of Pedestal Mount Assembly to Various Pedestal Sizes 3 The FLEX ZRFEG may be mounted to 7 8 square or up to 2 diameter round pedestals by adjusting the engagement of the U Bolt Fi...

Страница 3: ...ering the opposite side on the pedestal mounting brackets to manually align the four corners and mounting hole locations See Figure 4 1 and 4 2 5 Once all four corners and mounting holes are aligned i...

Страница 4: ...HE LASER OFF WHEN IT IS NOT IN USE OR IS LEFT UNATTENDED FOR A PERIOD OF TIME REMOVE THE BATTERIES WHEN STORING FOR AN EXTENDED PERIOD OF TIME TO AVOID DAMAGE TO THE TOOL SHOULD THE BATTERIES DETERIOR...

Страница 5: ...t cassettes See Figures 37 through 39 for installation of 4 port and 6 port rails for use with 4 port and 6 port cassettes Figure 8 Figure 9 Page 5 of 19 Figure 6 Table 1 MAXIMUM MODULE POPULATION PER...

Страница 6: ...Mate MPO connectors from fiber cable to rear of cassettes starting from the bottom Bundle strands together with hook n loop See Figure 10 Figure 10 hook n loop Figure 12 Figure 11 c Install remaining...

Страница 7: ...oute cables through 1st bottom position in 4RU cable canager Secure cables to 4RU manager 1st position with hook n loop See Figures 14 through 15 Figure 16 Figure 17 1st bundle of 72 fiber cables 2nd...

Страница 8: ...cable up by bundles towards patch panel Route bundle 3 through 4RU cable manager position 3 Route bundle 4 through top position 4 in 4RU cable manager Secure fiber cable bundles with hook n loop See F...

Страница 9: ...23 Figure 24 Fasten all fiber cable bundles together with one hook n loop g Grab handle and rotate patch panel downward ensuring that no fiber cables are pinched See Figure 25 Page 9 of 19 h Populate...

Страница 10: ...for ease of editing and label replacement when necessary The labeling location on top is PANDUIT Part 00053EEF which is removable Labeling See Figure 27 The labeling layout for the patch panel see Fi...

Страница 11: ...s 0 0 0 5 3 E E F 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64...

Страница 12: ...e Figure 29 Disconnect trunk cable from the rear of the cassette and con nect it to the rear of the replacement cassette Re install cas sette or MPO FAP opposite the way it was removed Align the rear...

Страница 13: ...ages shown in top view for clarity From the rear of the patch panel select the FAP to add additional MPO trunk cables to Insert the MPO connector into the rear of the FAP diagonally between the posts...

Страница 14: ...y Once the rail is fully re inserted the front of the rail will snap into position Pull forward on the rail to ensure it is properly installed While continuing to apply downward pressure on the rail b...

Страница 15: ...urations Only patch panel trays are shown for clarity 12 Port Configuration no removable rails installed on tray See Figure 37 6 Port Configuration 1 black removable rail per tray See Figure 38 4 Port...

Страница 16: ...n suc cessfully attached drop the cover into the enclosure as shown See Figures 41 through 42 Option 1 HD Flex Zone Raised Floor Enclosure Cover FLEX ZRFECG Enclosure s Cover Installation Attach Adhes...

Страница 17: ...ll Partition FLEX ZRFEWPG Lift up and remove both patch panels Secure partition walls with a total of 8 screws provided in the circled locations shown below in Figure 45 Install 4RU cable managers int...

Страница 18: ...le bundle 1 and working upward to cable bundle 4 Secure each bundle to the 4RU cable manager with hook n loop as shown in Figure 48 Page 18 of 19 Secure cables at rear of cassette through mounting hol...

Страница 19: ...h cassette routed to the left down and then to the right through the 4RU cable manager as shown in Figure 49 Rotate the patch panel mak ing sure that the fiber cables do not interfere with hit the enc...