Overview

 

This document provides installation instructions and configuration instructions to 
qualified personnel for installing a Panduit Metered, Switched, and Metered & 
Switched Power Distribution Unit (PDU) into a datacenter rack. Please read all 
instructions before operating the equipment and save this manual for future 
reference. 

Important Safety Information

 

See the complete regulatory compliance notices in Safety and Compliance Information 
for Server, Storage, Power, Networking, and Rack Products on the Panduit website 
(http://www.panduit.com/). In addition, follow the safety precautions that are specific to 
this device. 

This PDU is intended only for Information Technology Equipment (ITE) loads with 
linear/Power Factor Corrected (PFC) input current. If non-linear loads are connected, 
the nameplate current rating of the PDU must be reduced by a factor of 0.8. 

WARNING: 

A risk of personal injury from electric shock and hazardous energy 

levels exists. The installation of options and routine maintenance and service of this 
product must be performed by individuals who are knowledgeable about the 
procedures, precautions, and hazards associated with AC power products. 

IMPORTANT SAFETY INSTRUCTIONS-----SAVE THESE INSTRUCTIONS 

Follow these safety precautions when connecting multiple hardware 
components to power sources 

WARNING: 

To reduce the risk of fire, electric shock and damage to the 

equipment: 

HIGH LEAKAGE CURRENT. 

To reduce the risk of electric shock due to high 

leakage currents, ensure that there is a reliable grounded (earthed) 
connection before connecting power distribution products to AC power. If a 

Содержание ES2P

Страница 1: ...ES2P Intelligent PDU Installation Manual V1 1...

Страница 2: ...nt and Phase Distinction 8 Section 2 Installing the PDU 9 Vertical PDUs 9 Install Mounting Hardware 9 Install Bracket Hardware BRK01 Optional 10 Vertical 0U PDU Single Installation 11 Vertical 0U PDU...

Страница 3: ...ipment ITE loads with linear Power Factor Corrected PFC input current If non linear loads are connected the nameplate current rating of the PDU must be reduced by a factor of 0 8 WARNING A risk of per...

Страница 4: ...f fire or electric shock install this PDU in a temperature and humidity controlled indoor environment free of conductive contaminants Do not operate near water or excessive humidity 90 maximum noncond...

Страница 5: ...5 ES2P PDU INSTALLATION MANUAL Required Tools The following tools maybe required for installation Phillips screwdriver Torx screwdriver...

Страница 6: ...the local display Panduit PDUs are designed for use with all Panduit cabinets and are compatible with most third party data center racks The PDU models vary in form factor with several mounting confi...

Страница 7: ...r front of rack Higher operating temperature all Essential series PDUs rated for 60 C operating temperature Color coded outlets to circuit breakers used to easily differentiate load segments andphases...

Страница 8: ...n the rack or in the true 0U space on the side of the rack between the RETMA rails Load Segment and Phase Distinction Panduit Essential PDUs have colored receptacles to help distinguish between the di...

Страница 9: ...two mounting hole locations on the back of the PDU for the button installation to assist with mounting in a non Panduit racks When installing the mounting buttons use either mounting hole as a set Mo...

Страница 10: ...dition for installing the mounting buttons Bracket Installation Outlets Facing the Center of the Rack Each vertical PDU can install the optional bracket with provided screws on the end of the PDU 1 Al...

Страница 11: ...the rack Vertical 0U PDU Two or More Installation For two full height in a 42U 45U 48U rack two mid height in a 42U 45U 48U rack or four half height in a 42U 45U 48U rack vertical units to be mounted...

Страница 12: ...Mounting Hardware Installation 1U PDU Mounting in a U Position of the Rack 1 Install the cage nuts at the desired U location 2 Screw the mounting bracket ears into the RETMA rail surface at the U loca...

Страница 13: ...ground bonding cable if the rack contains any conductors for functional grounding or bonding of ungrounded metal parts This bonding point can also be used to bond the PDU to a known earthed reference...

Страница 14: ...ins an external earthing screw with a star washer which should be used for supplementary Earth bonding to the rack metalwork Bonding Minimum Requirements for Bonding Conductors Up to and including 32A...

Страница 15: ...h in the PDU power cord to reach the PDU power source 1 Turn the feed circuit breaker Off 2 Make sure that all circuit breakers on the PDU are set to On 3 Connect each PDU to an appropriately rated br...