background image

INSTRUCTIONS CM661A

For Technical Support: www.panduit.com/resources/install_maintain.asp

Page 7 of 12

Equipment Rail Installation

Move equipment rail to desired positon

Secure equipment rail to cabinet with[4] Torx screws and [4] hex nuts per rail

NOTE: Front equipment rails are integral to the cabinet frame and are in a fixed position

NOTE: Diamond cutouts on cabinet frame indicate mounting holes to allow for 742mm industry standard 
equipment rail spacing. Mount equipment rails to mounting holes immediately in front of diamond cutouts.

[2] M6 Torx Screws
(use T30 Torx bit)

[2] Hex Nuts
(use 10mm wrench)

[2] M6 Torx Screws
(use T30 Torx bit)

[2] Hex Nuts
(use 10mm wrench)

Diamond Cutout

Diamond Cutout

Содержание E6212B1FP

Страница 1: ...STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINETFROM CARTON CM661A...

Страница 2: ...of 12 Enterprise Cabinets E6212B1FP E6212B1FP5 E6412B2FP E6412B2FP5 Server Configured NOTE Some views in this document may vary slightly from your actual cabinet configuration Tool List 27mm wrench 2...

Страница 3: ...Frame Assembly 4 Leveling Leg and Caster Installation 5 Leveling 6 Equipment Rail Adjustment 7 Top Cap Installation and Overhead Cable Openings 8 Grounding 9 Door Side Panel Bumper Installation 10 Fro...

Страница 4: ...Post note diamond cutout Frame Assembly Use 24 M6 Torx Screws to assemble 4 Cabinet Posts to Upper and Lower Cabinet Frame Members ASSEMBLED FRAME Lower Cabinet Frame Member Left Front Post with inte...

Страница 5: ...aintain asp Page 5 of 12 Leveling Leg and Caster Installation Install 4 Leveling Legs into cabinet frame to fully retracted position Install 4 Caster Assemblies with 4 Hex Nuts per caster 4 Leveling L...

Страница 6: ...et Leveling Side to Side Cabinet Leveling Leveling Ensure that 4 Leveling Legs are fully retracted Roll Cabinet into final position Lower the 4 Leveling Legs until the cabinet weight is fully supporte...

Страница 7: ...NOTE Front equipment rails are integral to the cabinet frame and are in a fixed position NOTE Diamond cutouts on cabinet frame indicate mounting holes to allow for 742mm industry standard equipment r...

Страница 8: ...with 6 M6 Torx Screws Cut 4 tabs of each Cutout with wire cutter to open each cable opening OPTIONAL NOTE If Cutouts are removed Panduit recommends installing CTCN1X5 Bezel and Cover not included for...

Страница 9: ...s install_maintain asp Page 9 of 12 8 Grounding Lug Locations Front and Rear of Beams Grounding Attach Grounding Lug or Grounding Bar at any of the 2 location s shown below Grounding location is indic...

Страница 10: ...bber Bumpers on each side panel Install 5 Rubber Bumpers for 24 RU doors or 3 Rubber Bumpers for 12 RU doors on each door NOTE Front Door is indicated by PANDUIT label 4 Rubber Bumpers Rubber Bumper i...

Страница 11: ...4 Hinge Brackets to cabinet frame 2 left front 2 right rear with 1 M6 Torx Screw per bracket Open Door s to approximately 90 Lift Door s up and insert hinge pins of door s into hinge brackets REVERSE...

Страница 12: ...t com Page 12 of 12 Side Panels Removal and Installation Install 2 Quarter turn Lock Assemblies as shown below Move Side Panel into place and insert tabs of panel into slots in beam of cabinet frame P...

Отзывы: